Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />..::.... <br />:. <br />PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User: <br />Agency or organization name : DRMS <br />003 State :Colorado <br />08(1612007 County: Weld <br />ESC Site :Holton Lakes <br />Permit or other job action : New 112C Permit <br />Task description :Replace Topsoil on 60 acres, <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bn <br />Scraper work team -Scraper : Cat 637G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area : Cat D8R Series 11- 8SU (2005) <br />Road maintenance -Motor grader : NA <br />-Water truck NA <br />okdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer NA NA <br />% Utilization-machine: 100 NA NA 100 NA NA <br />-Ripper attachment : NA NA NA 0 NA NA <br />Ownerhip cost/hour : $103.51 NA NA $51.18 NA NA <br />Operating cost/hour: $167.18 NA NA $73.75 NA NA <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour $32.96 NA NA $32.78 NA NA <br />Unit subtotals : $303.66 NA NA $157.70 NA NA <br />Number of units : 4 0 0 1 0 0 <br />Group subtotals : Work : $1,214.62 Support: $157.70 Maintenance : $0.00 <br />Total work team cost/hour : 31.372.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 15,000 LCY factor : NA volume : 15,000 LCY <br />Permitrlob #:M-2007-036 <br />Abbreviation :none <br />Filename :MO36-003 <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :NA