Laserfiche WebLink
Data in blue provided by DRMS/J. Stark - January'09 <br />Data in red obtained from recent DRMS cost estimates <br />Total <br />Equipment Ownership Operating Operator Hourly Ripper <br />(All CAT) Cost Cost Cost Cost Op. Cost <br />Dozers <br />D9R - SU 3.76 <br />1 Blade $ 62.35 $ 103.27 $ 32.78 $ 198.40 (3/14/07) <br />Loaders <br />1 966G <br />Reveg <br />1 equipment <br />Broadcast <br />seed <br />(contract <br />data) <br />Chisel <br />1 plowing <br />Weed control <br />1 spraying <br />12/08/08 212.27/acre <br />061071267 <br />$ 10.00 opaz <br />212.27/acre 121812008 <br />12/01/05 <br />$ 68.08 (Montoya) <br />12/01/05 <br />$ 145.20 (Montoya) <br /> TOTAL <br />EQUIPMENT OWNERSHIP OPERATING OWN & OPERATOR HELPER UNIT <br />TYPE COST/HR COST/HR OP COSTS COST/HR COST/HR COST/HR DATE <br />haul rig U-Zb <br />1 tons $ <br />haul rig 26- <br />50 tons $ <br />haul rig 51+ <br />1 tons $ <br />$ 29.49 $ 40.39 $ 32.78 $ 102.66 <br />16.63 $ 44.38 $ 61.01 $ 27.66 $ 88.67 09/11/08 <br />18.37 $ 46.13 $ 64.50 $ 27.66 $ 25.39 $117.55 09/11/08 <br />22.33 $ 50.07 $ 72.40 $ 27.66 $ 25.39 $125.45 09/11/08