Laserfiche WebLink
3 {Form 2- .Public) <br />C. LOCATION iKAP: Attach a USGS 7.5 mirtute quad, or similar map of adequate scale, which locates the prospecting v- <br />site(s). <br />D. Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? 1'es ~ No <br />E. Specify the Land Management Agency, Address and Telephone Number: <br />- __ 3ZC.1 ~w~ Z. SS <br />l?y /3 o x 'Z r ~ _____ <br />F. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br />USFS. Check one: <br />Evidence of notification is attached to this NOI for BLM Land <br />Evidence of notification is attached to this NOI for USFS Land. <br />__ Other proof of notice is attached to this NOI <br />II. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />l . identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected. "Phis includes the iocation of all drill holes, mud pits, excavations, trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION <br />l . i3ineral(s} andlor Resources} being Investigated: //Jl/~~~~Cil~'IP/15 j~Zt~w1, ~,si~y ~~~ , %v~ <br />___.__ <br />2. Estimated dates of commencement and conrtpletian: <br />Commencement: JuAe Dpi , <br />Completion: C,3cti,8f/z O°/ W. ; <br />~ ~ / <br />3. Amount of material to be extracted, moved or proposed to be moved:_ 3~ ~d~ . 5/-~ (~ X 6 XZo <br />4. Identify the type or method of prospecting proposed and quantity (place an "X") <br />Cuts Pins Trenches <br />V__-__Shafts Tunnels ~,,,~Adits Declines <br />Air Drilling Fluid Drilling ____µlMlling & Blasting <br />