Laserfiche WebLink
3. Describe the measures to betaken for release of a reportable quantity of a hazardous material <br />or the release of a toxic substance. This includes plans for spill prevention, containment, <br />notification, and cleanup. <br />~r~r~e// is ,~~ .©///~; . ~ ~~ dim ur- cn~ s, ~-e ~~v s~ ~~.~ v;: ' ~.E'~~~ i ~ /a ~~ <br />H. Reclamation. Describe the annual and final reclamation standards based on the anticipated <br />schedule for construction, operations, and project closure. Include such items as the removal of <br />structures and facilities including bridges and culverts, a revegetation plan, permanent containment <br />of mine tailings, waste, or sludges which pose a threat of a release into the environment, closing <br />ponds and eliminating standing water, a final surface shaping plan, and post operations monitoring <br />and maintenance plans. <br />c~cr~c%c~i~i ~o~os~ <L,~m~~ovu- ~-~'e ~c~~~f~e.~ <br />YI. FOREST SER VICE EYAL UATION OF PLAN OF OPERATIONS <br />A. Required changes/modifications/special mitigation for plan of operations: <br />(Ifmore space is needed to fill out a block of information, use additional sheets and attach form) <br />-7- <br />~~ r ~c~-vzcc L,.9-,~d <br />