Laserfiche WebLink
Eagle Park Reservoir <br /> Final Analytical Summary <br /> October 29, 1997 <br /> • In addition, CIVIC will seed bare areas along the slope with the Climax Seed Mix (or other <br /> mix as may be approved by the Division in pending Technical Revisions). <br /> Employment of geotextiles and erosion netting are not foreseen within this specific reclamation <br /> approach. CIVIC does not feel that geotextile approaches are warranted due to the fact that <br /> placement of erosion control mats would require slope preparations (excavation and clearing) that <br /> would increase instability of the soil mantle. <br /> lot <br />