My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-02_REVISION - M2004009 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004009
>
2009-03-02_REVISION - M2004009 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:44 PM
Creation date
3/3/2009 1:47:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004009
IBM Index Class Name
REVISION
Doc Date
3/2/2009
Doc Name
TR Submittal
From
Asphalt Specialties Co.
To
DRMS
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.4 Exhibit D - Mining Plan <br />Table 6.4.4.1 - Mining Timetable in Sequence <br />Mining Cell Area Approximate Time Until Complete <br /> [acres] <br />Cell 2 63 4 years <br />Cell 3 13 1 year <br />Cell 5 1.5 0.25 years <br />Cell 6 9 0.75 years <br />Cell 4 9 0.75 years <br />Total 95.5 -6.75 years <br />Nature of Deposit <br />The overburden occurs at an average thickness of 3 ft east of Boulder Creek and <br />an average of 5 ft west of Boulder Creek. The sand and gravel deposit occurs at <br />an average thickness of 10 ft. The overburden is composed of an average 0.5 ft <br />of loam followed by silty and clayey sand to sandy and silty clay. <br />Underlying Stratum <br />The sand and gravel is underlain by shale. <br />Commodities <br />The primary commodities are sand and gravel. There are no incidental <br />commodities. <br />Explosives <br />No explosives will be used in the mining process.
The URL can be used to link to this page
Your browser does not support the video tag.