Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 052 State : Colorado Permit/job #: C-1980-004 <br />Date : 0310212009 County :Garfield Abbreviation :none <br />User : JRS Site: Mcclane Canyon Mine Filename :0004-052 <br />Permit or other job action : Technical Revision 16 <br />Task description : Place Three Feet of Cover on Coal Mine Waste Pile <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Description <br />Cost Bre <br />Scraper work team -Scraper :I Cat 627G w/push pull <br />-Push dozer :INA <br />Support equipment -Load area :INA <br />-Dump area :INA <br />Road maintenance -Motor grader : NA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $67.01 NA NA NA NA NA <br />Operating cost/hour : $133.84 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $225.79 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $451.58 Support: $0.00 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 7,500 BCY factor <br />Total work team cost/hour : $451.58 <br />Loose <br />1.250 volume : 9.375 LCY <br />Source of quantity take-off :Figure 2.2-2, Operator Estimate <br />Source of estimated swell factor : CAT Handbook