My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-02_REPORT - C1992080
DRMS
>
Day Forward
>
Report
>
Coal
>
C1992080
>
2009-03-02_REPORT - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:01 PM
Creation date
3/3/2009 10:30:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
REPORT
Doc Date
3/2/2009
Doc Name
Compliance Inspection of Wastewater Treatment Facilities
From
Colorado Dept of Public Health
To
Oakridge Energy, Inc
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit No. COG-850000 <br />Facility No. COG-8J0042 <br />Page I b <br />ALTERNATE LIMITATIONS FOR POST MINING RECLAMATION AREAS <br />Any discharge or increase in the volume of a discharge from a reclamation area, caused by precipitation within any 24-hour <br />period greater than the 10-year. 24-hour precipitation event (or snowmelt of equivalent volume) Ma substitute the following <br />limitations for these specific parameters only, subject to burden of proof requirements described in Part I.B.6 of the permit. <br />Parameter <br />Limitations <br />30-Day .7-Day Daily Rationale <br />Avg_ - Avg_ Max_ <br />Monitoring Sample <br />Frequency' Type <br />Federal Effluent Limitation Guidelines <br />Settleable Solids, ml/1 Report NA Report Federal ELG Weekly Grab <br />Sediment Control Plan -Applicable to ReelamadonAreas Served by OzdfaUs 001 and 002. <br />The Sediment Control Plan requirements in Part LB.3_b_ of the permit apply to the reclamation areas at this facility. The permittee shall <br />prepare and submit a Sediment Control plan by duly 1.2009_ The Division will review the Sediment Control Plan and approve it. Once <br />approved by the Division, the Sediment Control Plan will become a part of this permit certification by reference. <br />Compliance Schedule for Sediment Control Pldn for Red4niadon <br />Code 12505 A Sediment Control Plan shall be prepared and submitted by duly 1.2009 for the Reclamation Areas as required under Part <br />I.B.3.b. of the CDPS General Permit for Coal Mining Facilities and 40 CFR 434.82_ The plan required by this compliance schedule shall <br />be directed to the Industrial Unit of the Permits Section for final review <br />Code Eittt Description Permit Citation. Due.Ddte <br />12505 Submit Plan Submit Sediment Control Plan Part LB. 3. b. 07101109 <br />Other Conditions <br />Antidegradation <br />Antidegradation review does not apply to this permit because limitations based on Water Quality Standards are not applied in this <br />certification. <br />Groundwater Contamination <br />If groundwater contamination is encountered, then the permittee is to contact the Division, cease all discharges, and if appropriate, <br />contact the owner of the collection system receiving the discharge. Since the discharge of contaminated groundwater is not covered <br />under this permit, the permittee shall immediately apply for a groundwater remediation certification, which will include appropriate <br />requirements for additional discharge monitoring and on-site environmental response capabilities- <br />Sampling <br />Sampling shall occur at a point alter treatment, or slier the implementation of any Best Management Practices (BMPs). If BMPs or <br />treatment are not implemented, sampling shall occur where the discharge leaves control of the permittee; and prior to entering the ` - <br />receiving stream or prior to discharge to land- Samples must be representative of what is entering the receiving stream. <br />Monitoring and Reporting <br />Discharge. Monitoring Reports (DMR) must be submitted monthly as long as the certification is in effect. The permittee shall provide the <br />Division with any additional monitoring data on the permitted discharge collected for entities other than the Division. This will be <br />supplied to the Division within 48 hours of the receipt of the data by the permittee_ <br />Best Management Practices <br />The permittee shall implement and maintain the Best Management Practices (BMP) for the prevention of erosion and the control of solid <br />and liquid pollutants due to the discharge- BMPs include various options, such as: modification of the pipe discharge structure to disperse <br />flows; containment of water by hay bales or other comparable structures; the use of geocloth, filter fabric, or plastic sheeting for protection <br />of containment structures; rip-rap; and/or any other approved methods. <br />The General Permit for Coal Mining is attached and the permittee should review this permit for familiarity with all of the permit <br />requirements. If the permittee has questions related to this certification that cannot be answered by a review of the permit, the permit writer <br />should be contacted <br />Andrew J Neuhart <br />303-692-3655 <br />06116108
The URL can be used to link to this page
Your browser does not support the video tag.