Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: Pond #1 <br />Inspection Period: Fourth Quarter 2008 <br />Inspection Date: 12/29/08 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies west of the Development Waste Pile. The majority of <br />run-off from this waste pile flows to this pond: <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Excellent Moderate Few Poor <br />Extensive Some (Te <br />None <br />Yes No /.? <br />Yes No v <br />4). Erosion of the downstream toe of the embankment? Yes No ?- <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes No <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity : Extensive Moderate <br />Yes 1--' <br />Yes <br />Yes <br />Yes <br />Just starting None <br />No <br />No <br />No <br />No t/