Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />None <br />Fourth Quarter 2008 <br />12/29/08 <br />General Description or Reference to Site Plan: <br />Pond 6 is a non-discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean-out <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate Poor <br />Extensive ome Few None <br />4). Erosion of the downstream We of the embankment? <br />Cause of erosion can be attributed to: <br />Yes No ``.-- <br />Yes No &- <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />No 1// <br />MSHA Qualified Impound t Inspector <br />111.27 zec? <br />Date