My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-26_GENERAL DOCUMENTS - M2000039
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2000039
>
2009-02-26_GENERAL DOCUMENTS - M2000039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:53 PM
Creation date
3/2/2009 4:01:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000039
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/26/2009
Doc Name
Cost summary form no bond increase
From
DRMS
To
McKenna Limestone Quarry
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Task # 003 State : Colorado <br />Date : 0212612009 County :Huerfano <br />User : KAP Site : Mc Kenna Limestone <br />Permit/job # :M-2000-039 <br />Abbreviation :none <br />Filename :M039-003 <br />Agency or organization name : Colorado Division Of Reclamation Mining Arid Safety <br />Permit or other job action : Bond recalculatin related to inspection <br />Task description : Rip compacted areas <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $70.58 NA <br />Dozer operating cost/hour : $103.27 100 <br />Ripper operating cost/hour : $7.52 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $214.14 Total fleet cost/hour : $214.14 <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic: NA NA Load factor : NA Bank volume : NA BCY <br />Area : 3.00 acres Rip depth (ft) : 1.00 Volume : 4,840 BCY or CCY <br /> <br />Source of estimated quantity :Reclamation plan <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic: Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,397.43 cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 6.000 feet <br />Average ripping width : 7.67 -feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 300.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.866 acres/hour Adjusted unit production : 1.159.87 cu. yds./hour <br />Unadjusted production : 1,397.43 cu. yds./hour Adjusted fleet production : 1,159.87 cu yds./hour <br /> <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 4.17 hours <br />Unit cost : $0.185 per cu. yd. Total job cost : $894 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.