Laserfiche WebLink
F <br />(Page 3) <br />MINE ID # OR PROSPECTING ID #: U-1972-9> > <br />INSPECTION DATE: 12/5&11/2098 afiel /09 INSPECTOR=S INITIALS: BK_- <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION DATE <br />Possible Violation # 1: 3 /10/ 09-1 <br />failure o protect areas outside o the affected an rom slides or amage occurring unn <br />the minin o <br />eration and reclamation in accordanc <br />ith C <br />R <br />S 34 <br />32 <br />5 <br />116 <br />AND <br />4 <br />? <br />4 <br />1 <br />4/3/09-2 & 3 <br />p <br />e w <br />. <br />. <br />- <br />- <br />- <br />(qq <br />( <br />)( <br />) <br />an failure TO Comply With the conditions o a perms in accor ance WIM L' K-b- 54- 5- 8/28/09-4 <br /> <br /> PB or PV: PAL <br /> TOPIC(S): <br /> MP,RS,OD, <br /> BG <br />CORRECTIVE ACTIONS: - <br />1) Immediately secure the slide and surrounding areas to prevent access by the public. This <br />may include a combination of gates, fencing and warning signs around the perimeter of the <br />permit area. (To be completed by 3/10/09) <br />2) Submit a technical revision by 4/3/09 detailing a plan to monitor movement of the slide area, <br />overhanging limestone, tension cracks, and areas immediately north and south of the slide <br />The revision must include methodology, reporting requirements and implementation dates. <br />3) Provide a second technical revision by 4/3/09 which will include a report of investigations <br />regarding the cause(s) of the failure. In addition, this revision must include a plan for future <br />geologic, hydrologic and geo-technical investigations, the finding of which will used to prepare <br />an amendment to the permit application. <br />4) Provide an amendment to the permit to revise the mining and reclamation plan by 8/28/09). <br />This application must address stabilization of the quarry and provide for reclamation to meet the <br />performance standards of the Construction Materials Statute and Regulations