My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-26_PERMIT FILE - M2009018 (15)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009018
>
2009-02-26_PERMIT FILE - M2009018 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:53 PM
Creation date
2/27/2009 12:58:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009018
IBM Index Class Name
PERMIT FILE
Doc Date
2/26/2009
Doc Name
Ex. L Reclamation Costs
From
Varra Companies, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L - Reclamation Costs <br />+ 11,357.59+- (50+ % failure) <br />$ 4,072.77± Total reseeding costs <br />OTHER MISCELLANEOUS COSTS: <br />Mobilization and demobilization costs are based upon the Division's estimate of 8 <br />pieces of equipment at $125.00± per hour for 4.0± hours, or $4,000.00±. <br />Demolition of Structures: None. Building Permits for structures will be obtain <br />where required from the Weld County Building Department. <br />Please Note: The per unit cost values derived from previous RMS <br />determinations for heavy equipment, as applied to this exhibit, are included at <br />the back of this exhibit. Since there is no possibility of the applicant in fully <br />reproducing the Division's methods, utilizing similarities from past RMS <br />calculations is the most viable and accurate means available for the applicant <br />to derive reasonable estimates of per unit costs and should result in estimates <br />very reliable with that of the Division. <br />Summary of Reclamation Costs: <br />$ 33,212.71± Total Site Preparation Prior to Re-soiling. <br />$ 7,522.61± Total Re-soiling <br />$ 4,072.77± Total Re-vegetation <br />$ 44,808.09± Sub-Total <br />$ 4,000.00± Mobilization and Demobilization Costs (8 pieces of equipment) <br />$ 48,808.09± Sub-Total <br />$ 8,834.27± RMS Indirect Costs @ 18.1 % of Total Reclamation Costs <br />$ 579642.36± Grand Total - Financial Warranty Amount <br />Varra Companies, Inc. Heintzelman Project RMS 112 Permit Application 6 <br />2 February 2008
The URL can be used to link to this page
Your browser does not support the video tag.