Laserfiche WebLink
Exhibit D- Mining Plan <br />6.4.4 EXHIBIT D - Mining Plan <br />The mining plan shall supply the following information, correlated with the affected <br />lands, map(s) and timetables: <br />(a) description of the method(s) of mining to be employed in each stage of the <br />operation as related to any surface disturbance on affected lands; <br />(b) earthmoving; <br />(c) all water diversions and impoundments; and <br />(d) the size of area(s) to be worked at any one time. <br />(e) An approximate timetable to describe the mining operation. The timetable is for <br />the purpose of establishing the relationship between mining and reclamation <br />during the different phases of a mining operation. An Operator/Applicant shall <br />not be required to meet specific dates for initiation, or completion of mining in a <br />phase as may be identified in the timetable. This does not exempt an <br />Operator/Applicant from complying with the performance standards of Section <br />3.1. If the operation is intended to be an intermittent operation as defined in <br />Section 34-32.5-103(11)(b), C.R.S., the Applicant should include in this exhibit a <br />statement that conforms to the provisions of Section 34-32.5-103(11)(b), C.R.S. <br />Such timetable should include: <br />(i) an estimate of the periods of time which will be required for the various <br />stages or phases of the operation; <br />(ii) a description of the size and location of each area to be worked during <br />each phase; and <br />(iii) outlining the sequence in which each stage or phase of the operation will <br />be carried out. (Timetables need not be separate and distinct from the <br />mining plan, but may be incorporated therein.) <br />(f) A map (in Exhibit C - Pre-Mining and Mining Plan Maps(s) of Affected Lands, <br />Subsection 6.4.3) may be used along with a narrative to present the following <br />information: <br />(i) nature, depth and thickness of the deposit to be mined and the thickness <br />and type of overburden to be removed (may be marked <br />"CONFIDENTIAL," pursuant to Paragraph 1.3(3)); and <br />(ii) nature of the stratum immediately beneath the material to be mined in <br />sedimentary deposits. <br />(g) Identify the primary and secondary commodities to be mined/extracted and <br />describe the intended use; and <br />(h) name and describe the intended use of all expected incidental products to be <br />mined/extracted by the proposed operation. <br />(i) Specify if explosives will be used in conjunction with the mining (or reclamation). <br />In consultation with the Office, the Applicant must demonstrate pursuant to <br />Subsection 6.5(4), Geotechnical Stability Exhibit, that offsite areas will not be <br />adversely affected by blasting. <br />Note: For additional information on features and areas described, please refer to <br />Exhibit C-1: Existing Conditions Map and C-2: Extraction Map. <br />Varra Companies, Inc. Heintzelman Project RMS 112 Permit Application 1 <br />2 February 2008