Laserfiche WebLink
Seneca Reclaim Top Pasture: <br />Total pasture acreage = 579.0 acres <br />Reclaim area = 452.6 acres = 78% of total pasture <br />Undisturbed area = 118.6 acres = 20% of total pasture <br />Fenced Shrub Plot acres = 7.8 acres = 2% of total pasture <br />Reclaim area -average production = 902 lbs/acre (see 2006 Revegetation Monitoring Report) <br />Undisturbed area -average production = 507 lbs/acre (see 2006 Revegetation Monitoring Report) <br />Pasture (weighted average) Production = 8101bs/acre <br />15 days (x) 120 cow/calf pairs = 1,800 animal days (/) 30 days = 60 animal months (x) 1.0 AUM/pair = <br />60 AUMs <br />8101bs/acre (x) 571.2 acres = 462,672 lbs of forage available <br />8101bs (x) 60 AUMs = 48,6001bs of forage required <br />Therefore; <br />48,600 (/) 462,672 (x) 100 = 10.5 % utilization of the entire Seneca Reclaim Top Pasture <br />Total Utilization: <br />116,640 lbs (/) 898,564 lbs (x) 100 =13 % utilization of the total acres available for grazing <br />CHRONOLOGICAL HISTORY OF REVEGETATION <br />Total areas revegetated prior to and in 2008 at the Seneca II-W Mine are shown on the attached 2008 <br />Chronological Seeding map. <br />• SEDIMENTATION POND SURVEYS <br />SCC is required by Permit C-82-057 to monitor sedimentation ponds for sediment storage capacities. This <br />monitoring is conducted by physically surveying each pond each year. This schedule provides a sediment <br />yield history and gives advanced warning to operations personnel when sediment clean out work is needed. <br />Also, in accordance with Rule 4.05.6(11)(c), SCC visually inspects each pond, at a minimum, quarterly each <br />year. During these inspections, any drastic change in sediment storage/sudden increase in a sediment delta at <br />the inlet of the pond would be detected and mitigation implemented, if necessary. <br />The results of the 2008 annual survey indicated that all ponds are within the minimum requirement for <br />storage and are shown on Table 08.5, Sediment Pond Capacities. <br />STOCK TANKS <br />Stock tank T25 was completed in 2008. <br />WILDLIFE MONITORING <br />SCC contracted Jones and Stokes to conduct wildlife surveys and monitoring at the Seneca II-W mine area. <br />The work included: <br />1. Monitoring of Columbian sharp-tailed grouse leks and checking for new ones (April 28, 2008) <br />2. Checking golden eagle nests for activity (April 28, 2008) <br />• Methodologies, data and results of the big game aerial survey, eagle nest activity, and sharp-tailed grouse <br />activity are presented in the attached 2008 Wildlife Monitoring Report. <br />4