Laserfiche WebLink
'DATE : September 12, 1996 <br /> ACCESS PERMIT NUMBER 3961'14 - SHEET 2 <br />• ISSUED TO: Bowie Resources Limited <br /> TERMS AND CONDITIONS <br /> 1. Trees must be removed to provided 455 feet of sight <br /> distance. <br /> 2. If there are any questions regarding this permit, please <br /> contact Charles Dunn at (970) 29D-7234. <br /> 3. The Permittee shall refer to all additional standard <br /> requirements on the back of this permit and any enclosed <br /> additional terms, conditions, exhibits and noted <br /> attachments. <br /> 4. Tliis permitted access is only Eor the use and purpose stated <br /> in the Application and Permit. <br /> 5. bla to r, sanitary, sewer, gas, electrical, communication, <br /> landscaping, and telephone installations will require <br /> individual additional permits. <br /> 6. The Permittee is responsible for obtaining any necessary <br /> additional federal, state and/or City/County permits or <br /> clearances required for construction of the access. <br /> Approval of this access permit does not constitute <br /> verification of this action by the Permittee. <br /> 7. Any work within State Highway right-of-way shall begin after <br /> 8:30 A.M. and all wo rlc and equipment shall be off the <br /> highway BEFORG 3:30 P.M. each day. <br /> 8. It is the responsibility of the Permittee to prevent all <br />• livestock from entering the State Highway right-of-way at <br /> this access location. Any iivestock that does enter the <br /> Highway right-of-way shall be the sole responsibility of the <br /> Pe rinittee. <br /> 9. A FULLY E?:ELUTED COMPLETG COPY OF THIS PERMIT MUST BE ON THE <br /> JOB SITE WITH THE CONTRACTOR AT ALL TIMES DURING THE <br /> CONSTRUCTION. FAILURE TO COMPLY WITH THIS OR ANY OTHER <br /> CO[STRUCTION REQUIREMENT NAY RESULT IN THE IMMEDIATE <br /> SUSPENSION OP WORK BY ORDER OP THE DEPARTMENT INSPECTOR OR <br /> 1'HE ISSUING AUTHORITY. <br />10. Survey markers or monuments must be preserved in their <br />original positions. Notify the Department at (970) 248-7220 <br />immediately upon damage to or discovery of any such markers <br />or monuments at the work site. Any survey markers or <br />monuments disturbed during the execution of this permit <br />shall be repaired and/or replaced immediately at the expense <br />of the Permittee. <br />11. It shall be the responsibility of the Permittee to verify <br />the location of the existing utilities and notify all <br />utility owners or operators of any work that might involve <br />utilities within the State Highway right-of-way. Any work <br />necessary to protect existing permitted utilities, such as <br />an encasement will be the responsibility of the Permittee. <br />Any damage or disruption to any utilities during the <br />construction shall be the Pe rmittee's responsibility and <br />shall be repaired or replaced at no cost to the Department. <br />12. Any damage to any present highway facilities including <br />• traffic control devices shall be repaired immediately at no <br />cost to the Department and prior to continuing other work. <br />Any mud or other material tracked or otherwise deposited on <br />the roadway shall be removed daily or as ordered by the <br />Department inspector. <br />