My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-12_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2009-01-12_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:47 PM
Creation date
2/27/2009 10:08:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/12/2009
Section_Exhibit Name
Exhibit 13 Other Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE HIGHWAY ACCESS PERMIT #399059 June 7, 1 f199 <br />Issued to Bowie Resources, Inc. <br /> TERMS & CONDITIONS • <br />I. This permit is issued in conlunction ++•ith Permit Ns 399058. Submittal for design shall include considerations for <br /> all of these permits. (only one submittal required) If there are any questions regarding this permit. please contact <br /> Mike Smith at (970) 248-7231. <br />?. The Permittee shall design and submit (or approval a left turn deceleration lane 16 feet in width m conformance <br /> with section 4 of [he State Highway Access Code, 2 CCR 601 <br />3. Design of this access with auxiliary lanes shall include, at a minimum, I'fe-inch overlaiy. <br />4. A Notice to Proceed, CDOT Form 1265 is required before beginning the construction of the access or smy activity <br /> within the highway right-ot-way. All submittals, documents, plans and other items that must be completed, shall <br /> be submitted and approved before a Notice to Proceed will be issued. Contact the Department (or local issuing <br /> authority) for the Notice to Proceed. <br />5. The following items are required before a Notice to Proceed will be issued: <br /> (a) Construcnon Plans Stamped by a Colorado Registered Professional Engineer. <br /> (b) Certificate of Insurance Liability as per Section 2.3(1 I)(h) of the Access Code. <br /> (c) Traffic Control Plan <br />6. The Permittee shall refer to all additional standard requirements on the back of [his permit and any enclosed <br /> additional terms, conditions, exhibits and noted attachments. <br />7. This Permit is issued in accordance with [he State Highway Access Code (2 CCR 601-] ), and is based in part upon <br /> the information submitted by the Permittee. This permit is only for the use and purpose stated in the Application <br /> and Permit. Any changes in traffic volumes or type, drainage, or other operational aspects may render this perrziit <br /> void, requiring a new permit to be applied for based upon existing and anticipated future conditions. <br />8. Upon completion of the access, the applicant shall notify [he Access Manager by certified mail within 10 days :tt: <br />• . <br /> Colorado Department of Transportation <br /> Mike Smith Region 3 -Access Manager <br /> 606 South 9'" Sveet <br /> Grand Junction, Colorado 81501 <br />9. Nothing in this permit shall prohibit the chief engineer from exercising the right granted in CRS 43-3-102 <br />Including but not limited to restricting left hand turns by construction of physical medial separations. <br />10. All costs associated with the installation of traffic lights for this access are [he responsibility of the Permittee. This <br />includes but is not limited to the design, consvuction, utility relocation, testing of materials and inspection. <br />11. Water, sanitary, sewer, gas, electrical, communication, landscaping, and telephone installations will require <br />individual additional permits. <br />12. The Permittee is responsible for obtaining any necessary additional federal, state andJor City/County permits or <br />clearances required for construction of the access. Approval of this access permit does not constitute verification <br />of this action by the Permittee. <br />13. Any work within State Hiehway right-of-way shall begin after 8:30 A.M. and all work and equipment shall be off <br />the highway BEFORE 3:30 P.M. each day. <br />14. No highway lane closures or one-way traffic will be allowed. <br />I5. No work will be allowed at night. Saturdays, Sundays and legal holidays without prior authorization from the <br />Department. The Department may also restrict work within the State Highway right-o(-way during adverse <br />weather conditions. <br />16. It is the responsibility of the Permittee to prevent all livestock from entering the State Highway right-o(-way at this <br />access location. Any livestock that does enter the highway right-of-way shall be the sole responsibility of the • <br />Permittee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.