Laserfiche WebLink
STATE HIGHWAY ACCESS PERMIT #399058 June 7, 1999 <br />Issued to Bowie Resources. Inc. <br />TERMS & CONDITIONS (cont'd) <br />"This design is in full compliance With Section 4 Of the State Highway Access <br />Code. '_ CCR 601-1 except for the following approved variances:-' <br />Note: ALL plans must be submiued on 11" x 17" sheets at a minimum scale of <br />I" = 20'. No other plan sheet sizes are authorized. Location drawings may <br />be suhmmed at other scales as approved. <br />'_?. All construction work must he under the direction of a Colorado Registered Professional Engineer and upon <br />completion of the work, that responsible Engineer shall submit an "As Built" plans, showing in detail all approved <br />construction changes, modifications and revisions. The "As Built" Plans must be sealed in accordance with CRS <br />I?-25-117. <br />?-1. It shall be the responsibility of the Permittee to verily the location of the existing utilities and notify all utility <br />owners or operators of any work that might involve utilities within the State Highway right-of-way. Any wort: <br />necessary to protect existing permitted utilities, such as an encasement will be the responsibility of the Permittee. <br />Any damage or disruption to any utilities during the construction shall be the Permittee's responsibility and shall <br />he repaired or replaced at no rnst to the Department. <br />25. Any damage ro any present highway facilities including traffic control devices shall be repaired immediately at no <br />cost to the Department and prior to continuing other work. Any mud or other ma[erial tracked or otherwise <br />deposited on the roadway shall be remo.•ed daily or as ordered by the Departmem inspector. <br />26. Areas oC roadwa}• andlor right-of-way disturbed during this installation shall be restored to their original <br />conditions, to insure proper strength, drainage and erosion control. <br />27. Any incomplete cons ruction activity on the State Highway that must be left overnight, shall be barricaded and <br />signed in accordance with the Manual on Uniform Traffic Control Devices and other applicable standards. • <br />2S. Open cuts, which are 6 inches in depth, within 30 feet o(tlte edge of the State Highway traveled way, will not he <br />left open at night, on weekends, or on holidays. <br />29. No more than 6 feet of trench areas shall be opened at any one time. Open trenches and other excavations within <br />the State Highway right-of-way shall he backfilled and/or paved before 3:30 P.M. o(each working day or be <br />protected in accordance with the M.U.T.C.D. <br />30. The area around the new work shall be well graded to drain, top soiled, fertilized, mulched and re-seeded in <br />accordance with the Department standazd specifications. <br />31. When it is necessary to remove any highway right-o(-way fence, the posts on either side oCthe access entrance <br />shall he securely braced with approved end posts and in conformance with the Department's M-607-1 standard, <br />before the fence is cut, to prevent slacking of the remaining fence. All posts and wire removed shall be returned to <br />the Department. <br />32. All excavations for utility lines, culverts, trenches or tunnels shall meet the requirements of the Occupational, <br />Safety and Health Administration (OSHA), Colorado Industrial Commission, Colorado Division of Mines or the <br />Colorado Department of Transportation, whichever applies. <br />33. All work that requires traffic control shall he supervised by a reeistered professional traffic engineer or by a traffic <br />control supervisor certified by the American Traffic Safety Services Association (ATSSA) or the Colorado <br />Contractors Association (CCA). When flagging personnel are required, the contractor in accordance with the <br />Department standards shall certify them. <br />34. Construction traffic control devices, when not in use, shall be removed or turned away from traffic. <br />35. All temporary pavement striping shall be done by the Permittee/contractor in conformance with section 627 oCThe <br />Department's standard specifications for Road and Bridge Construction (latest edition). <br />36. The Permittee shall do all final signing and pavement striping or the contractor in conformance with the • <br />Department's M S S standards and the M.U.T.C.D., unless otherwise agreed to by the Department and the <br />Permittee. A final signing and pavemcm striping plan shall he submiued to the Region 3 Traffic Engineer a <br />3- <br />