My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-12_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2009-01-12_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:47 PM
Creation date
2/27/2009 10:08:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/12/2009
Section_Exhibit Name
Exhibit 13 Other Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE HIU'HWAY ACCESS PERMIT #399058 June 7, '1999 <br />Issued to Botvie Resources. Inc. <br />TERMS & CONDITIONS <br />1. This permit is issued in conjunction with Permit N~ 399059. Submittal for design shall include considerations for <br />all of these permits. tonh one submittal required) If there are any questions regarding this permit. please contact <br />Mike Smith at (970) 2~8-7'71. <br />'_. The Prrmutee ,hall drsicn and submit (or approval a right turn acceleratiun lane 12 feet in width in conformance <br />with section 4 of the State Highway Access Code, 2 CCR 601 <br />7. Desiun of this access with auxiliary lanes shall include, at a minimum. 1'h-inch overlay. <br />4. A Notice to Proceed. CDOT Form 1265 is required before beginning the construction o(the access or any activity <br />within the highway right-of-way. All submittals, documents, plans and other items that must be completed. shall <br />br submitted and approved before a Notice to Proceed will be issued. Contact the Depannient (or local issuins <br />authorih•) for the Notce w Proceed. <br />5, The follotiing items are required before a Notice to Proceed will be issued: <br />(a) Construction Plans Stamped by a Colorado Registered Professional Engineer. <br />(b) Certificate of Insurance Liability as per Section 2.7(1 I)(h) of the Access Code. <br />(c) Traffic Control Plan <br />6. The Permittee shall refer to all additional standard requirements on the back of this permit and any enclosed <br />additional terms, conditions, ezhibits and noted attachments. <br />7. This Permit is issued in accordance with the State Highwa}' Access Code (2 CCR 601-I), and is based in part upon <br />the information submitted b}' the Permittee. This permit is only for the use and purpose stated in the Application <br />and Permit. Any changes in traffic volumes or type, drainage, or other operational aspects may render this permit <br />void, requiring a new permit to he applied for based upon existing and anticipared future conditions. <br />8. Upon completion of the access, the applicant shall notify the Access Manager by certified mail within 10 days at: . <br />Colorado Department of Transportation <br />Mike Smith Region 3 -Access Manager <br />606 Sou[h 9s Sveet <br />Grand Junction, Colorado 81501 <br />9. Nothing in this permit shall prohibit the chief engineer from exercising the right granted in CRS 93-3-102 <br />Including but not limited to restricting left hand turns by construction of physical medial separations. <br />10. All costs associated with the installation of traffic lights for this access are the responsibility of the Permittee. This <br />includes but is not limited to the design, construction, utility relocation, testing of materials and inspection. <br />I I. Water, sanitary, sewer, gas, electrical, communication, landscaping, and telephone installations will require <br />individual additional permits. <br />12. The Permittee is responsible for obtaining an}' necessary additional federal, state and/or City/County permits or <br />clearances required for construction of the access. Approval o(this access permit does not constitute verification <br />of this action by the Permittee. <br />13. Any work within State Highway right-of-way shall begin after 8:30 A.M. and all work and equipment shall be off <br />the highway BEFORE 3:70 P.M. each day. <br />14. No highway lane closures or one-u•ay traffic will he allowed. <br />I5. No work will be allowed at night, Sawrdays, Sundays and legal holidays without prior authorization from the <br />Department. The Department may also restrict work within the State Highway right-of-way during adverse <br />weather conditions. <br />16. ll is the responsibility of the Permittee to prevent all livestock from entering the State Highway right-of-way at this . <br />access location. Any livestock that does enter the highway right-o(-way shall be the sole responsibility of the <br />Permittee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.