Laserfiche WebLink
d. Outfa11004 <br />Effluent Parameter <br />_ _. _ <br />.. J....-...-__......._..._...... <br />Flo w, MM GD <br />r~ <br />• <br />PART I <br />Page No. 5 <br />Permit No.: CO-0044776 <br />Effluent Limitations <br />Maximum Concentrations <br />]!1 Il.... •.~.. _..,... 7 T.... A.,n..n..n lln:ly RiTn vi m~~m <br />0.0115 <br />NA <br />_.m,_. _.._._..._45 ...~.. <br />45 <br />~~12000 c1 <br />_ _N_A_ <br />...~ _-----N`4 -- <br />NA <br />Report <br />NA <br />NA <br />____._ .............._..NA...._.......~..........__. <br />__._.___.._..._-_0.5 ._._..__._.._. <br />...__~ _-_6.5-9 _,_.__.._.. <br />Report <br />5-day Biochemical Oxygen Demand (BODs), mg/1~ 30 <br />Total Suspended Solids (TSS), mg/1 r 30 <br />..._..__..__ .................~_.. _...-- _....._.._......__-_ _-_ ____..._.....__.._...__..__.._..............._...._ _ _.........._i...._......._._ _.._...__....__.._~. _... <br />Fecal Coliform Bacteria, Number/]00 mi ± 6000 c/ <br />Total Residual_Chlorine, mg/1 1 NA <br />pH, s.u. (minimum-maximum) --_.__..._....__.._.____._._.__~__.__.__._....-_NA_._ <br />Oil and Grease, mg/l..T_ _......__..___._...__._._..__.~_...._..____..._....NA.._...- <br />Total Dissolved Solids, mg/1 ; Report ' NA <br />_....__.___. _..._--..-------._.__..._._........_....._....._...__._...__..._.._..__~_..___....._._....._._.__.._..__..._.....__...._..---._._.__.._..__.....___t__._.__...._.._..._.__._.__-..._. <br />2. Whole Effluent Toxicity -Chronic Lethality Limitation - Outfa11006 and 010 <br />Beginning immediately and lasting through the expiration date, there shall be no statistically significant difference in lethality <br />(at the 95% confidence level) between the control and any effluent concentration at outfalls 006 and O 10 less than or equal to <br />100%% effluent. Such limitation shall apply as a daily maximum. <br />See Part I.C. for Definitions. <br />3. Alternate Limitation Burden of Proof Requirements <br />The permittee has the burden of proof when seeking relief from total suspended solids (TSS), total iron and/or settleable <br />solids (SS) limitations, as appropriate for outfalls containing surface runoff water. All outfalls except 004, 006, and 010 are <br />eligible for relief from TSS, total iron and SS, as applicable; however, the majority of the loading from any discharge has to <br />consist of storm runoff for the relief to be available. The permittee will need to show that exceedance of the applicable <br />limitations was caused by precipitation (surface runoff water) and not mine water, through a comparison of the loading from <br />each source. <br />Relief may be granted for each discharge occurrence only when necessary and shall not be granted when the permittee has <br />control over the discharge. The permittee should endeavor to meet the primary limitations whenever possible. <br />a. For active outfalls: For rainfal}, to waive TSS and total iron limitations, it is necessary to prove that discharge occurred <br />within 48 hours after measurable precipitation has stopped. In addition, to waive settleable solids limitations, it is <br />necessary to prove that discharge occurred within 48 hours after precipitation greater than the 10-year, 24-hour event has <br />stopped. For snowmelt, to waive TSS and total iron limitations, it is necessary to prove that discharge occurred within <br />48 hours after pond inflow has stopped. In addition, to waive settleable solids ]imitations, it is necessary to prove that <br />discharge occurred within 48 hours after pond inflow volume greater than the l0-year, 24-hour event has stopped. <br />b. For post-mining outfalls: For rainfall, to waive settleable solids limitations, it is necessary to prove that discharge <br />occurred within 48 hours after measurable precipitation has stopped. For snowmelt, to waive settleable solids limitations, <br />it is necessary to prove that discharge occurred within 48 hours after pond inflow has stopped. <br />Should a precipitation event or snowmelt occur, the permittee shall submit adequate proof in order for an exemption to be <br />claimed. Weather station data may be appropriate in making this demonstration. Said proof shall be submitted as an <br />attachment to the Discharge Monitoring Report (DMR) for the appropriate period. The Division shall determine the <br />adequacy of proof. As part of this determination, the Division shall evaluate whether the permittee could have controlled the <br />discharge in such a manner that primary limitations could have been met. All manual dewatering of ponds that are equipped <br />with automatic dewatering systems must meet TSS and total iron limitations. If a pond has only manual dewatering <br />capability, relief is available only to the extent required to regain necessary stability and capacity. <br />4. Post-Minine Areas <br />