Laserfiche WebLink
• <br />ACTIVE MONITORING WELLS <br />COMPLETION SUMMARY TABLE <br />2.05-83 9!29105 <br /> <br />Station <br />Number <br />Coal Mem . sot _,,,. <br />DH-15 <br /> <br />Station Name <br />a . ,, e <br />Steven's Draw-Drill Hole Surtace <br />Elevation <br />(ft.) <br /> <br />7143.3 Top of Casing <br />Elevation <br />(ft.) <br /> <br />7145.1 Total <br />Depth <br />(N.) <br /> <br />218.0 Pertoreted <br />Interval Depth <br />(8.) <br /> <br />186-218 Type of <br />Casing <br /> <br /> <br />Sch 40 PVC I.D. Diameter <br />of Casing <br />(in.) <br /> <br />4 <br /> <br />Formation or Seam Completed In <br /> <br />Located in Upper D Seam <br />DH-25 C Gulch-Doll Hole 7144.2 7148.5 333.0 303333 Sch 40 PVC 4 Localed in Upper D Seam <br />DH-38 D Gulch-Doll Hole 7245.1 7145.5 454.0 434-054 Sch 40 PVC 4 Located in Upper D Seam <br />DH-39 Steven's Draw-0dll Hole 7142.7 7143.9 180.0 10-160 Sch 40 PVC 4 Located Above Upper D Seam <br />DH-49 B Gulch-Drill Hole 7203.4 7204.1 323.0 106-323 Sch 40 PVC 4 Located in Upper D Seam <br />DHSS Dove Gulch-Monitodng Well 7845.2 7848.4 1030.8 1020.6-1030.8 Steel Pipe 3 Located Above Upper D Seam <br />DH417B Hubbard Creek-Monitoring Well 6450.9 8451.9 593.9 583-593 Sch BO PVC 2.25 Located in Upper B Seam <br />DH-67D Hubbard Creek-Monitoring Well 8450.9 8451.9 315.4 305-315 Sch 80 PVC 2.25 Located in Upper D Seam <br />DHE7abv Hubbard Creek-Monitoring Well 6450.5 8452.1 193.0 183-173 Sch 40 PVC 2.5 Located Above Upper D Seam <br />DH437b1w Hubbartl Creek-Monitodng Well 6450.5 6452.7 358.0 338-348 Sch 40 PVC 2.5 Located Below Upper D Seam <br />TC-03-01 East (R) Terror Creek -Monitodng Well 7117.6 7121.4 871.0 850570 Steel Pipe 3 Located in the Rollins Sandstone <br />TC-03-01 Upper (B) Terror Creek -Monitoring Well 7117.6 7121.4 713.3 882-702 Steel Pipe 3 Located in the Upper B Seam <br />TC-03-02 Terror Creek -Monitoring Well 7094.5 7095.0 585.9 576588 Steel Pipe 3 Located in Sandstone Above the Upper B Seam <br />TC-03-03 <br />or_ o[k .,Igv_u, <br />AW-1 Terror Creek- Monitodng Well <br />'on tov el <br />Alluvial Well 8998.2 <br /> <br />5976.70 6996.2 <br /> <br />5977.76 505.2 <br /> <br />120 495-505 <br /> <br />40-120 Steel Pipe <br /> <br />Sch 40 PVC 3 <br /> <br />4 Located in Sandstone ADOVe the Upper B Seam <br /> <br />Located in Alluvium <br />AW-2 <br />AW-3 Alluvial Well <br />Alluvial Well 5965.30 <br />5961.80 5966.82 <br />5962.98 50.4 <br />150 10-50.4 <br />70-150 Sch 40 PVC <br />Sch 40 PVC 4 <br />4 Located in Alluvium <br />Located in Alluvium <br />AW~t Alluvial Well 5976.79 5977.91 60 20-60 Sch 40 PVC 4 Located in Alluvium <br />AW-5 Alluvial Well 5981.00 5982.14 100 20-100 Sch 40 PVC 4 Located in Alluvium <br />AW-6 Alluvial Well 5979.80 5981.18 112 32-112 Sch 40 PVC 4 Located in Alluvium <br />AW-7 Alluvial Well 5947.83 5950.00 193 128.1-188.1 Sch 80 PVC 2.5 Located in Alluvium <br />AW-e Alluvial Well 5948.03 5950.00 80 28.758.7 Sch 80 PVC 2.5 Located in Alluvium <br />AW-9 Alluvial Well 5944.85 5946.00 60 88.8-78.8 Sch 80 PVC 2.5 Located in Alluvium <br />AW-11 Alluvial Well 5884.00 5884.33 60.88 40-50 Sch 80 PVC 2 Locatetl in Alluvium <br />AW-12 Alluvial Well 5878.00 5878.50 45.38 27-37 Sch 80 PVC 2 Located in Alluvium <br />AW-14 Alluvial Well 5822.00 5822.78 30 10-20 Sch 80 PVC 2 Located in Alluvium <br />AW-15 Alluvial Well 5972.22 5972.52 68 70-80 Sch 80 PVC 2 Locatetl in Alluvium <br />AW-18 Alluvial Well 5983.87 5984.87 75 80-70 Sch 80 PVC 2 Located in Alluvium <br />AW-17 Alluvial Well 5950.81 5950.81 62 50-80 Sch 80 PVC 2 I rx fwd in Alluvl~im <br />PR-09 <br />APPRo vED <br />!° ~12~05 <br />