My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-12_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2009-01-12_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:47 PM
Creation date
2/27/2009 10:08:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/12/2009
Doc Name
pg 2.05-59 to 2.05-126
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 2.05.6 <br />According to data supplied by the USGS, the annual seven day minimum flow for the <br />North Fork of the Gunnison River is 25 cfs. This low flow value occurred February <br />17, 1978, is for the period of record from 1934 through 1995 and is measured <br />upstream of the Town of Somerset, CO. <br />inflow/discharge of 1,000 gpm from Outfall 006 is utilized. <br />As explained in Section 2.04.7, the Bowie No. 2 Mine is experiencing an inflow of <br />approximately 700 gpm. Recent mine water quality analysis are shown above in <br />section 2.05.6(3)(a)(iv). For the purposes of this PHC a worst case mine <br />Flow from outfall 006 need only travel a short distance to enter a highway culvert and <br />join the North Fork of the Gunnison River. See Map 41, Mine Discharge Pipe <br />Alignment. The heavily vegetated water course from Outfall 006 to the highway <br />culvert will eliminate the possibility of sediment entering the North Fork of the <br />Gunnison River due to erosion. Since the mine discharge will mix with the River <br />water in a relatively short distance, there are no lands, river banks, structures, <br />alluvial valley floors or prime farm land on either side of State Highway 133 that <br />potentially may be adversely affected by the mine water discharge quantity or quality. <br />The average TDS and total recoverable Manganese measurements at the upstream <br />• North Fork of the Gunnison River monitoring station for the baseline period (2007 <br />AHR) are 130 and 0.015 mg/I respectively. The average iron measurement at the <br />upstream North Fork of the Gunnison River monitoring station for the baseline period <br />(2007 AHR) is 0.09 mg/I. The following table presents the estimated affect the <br />average mine water quality (page 2.05-70i) will have on the quality of water in the <br />North Fork of the Gunnison River at low flow: <br />PHC North Fork of the Gunnison River <br />• <br />Flow Flow TDS Manganese Iron <br />Gpm Cfs mg/I Trec. mg/I Trec, mg/I <br />North Fork 11,220 25 130 0.015 0.09 <br />Mine Discharge 1,000 2.2 2,838 0.037 2.43 <br />Combined Flow 12,220 27.2 352 0.017 0.28 <br />Based upon the above calculations, the mine discharge into the North Fork of the <br />Gunnison River will not have a measurable impact on total recoverable manganese <br />or total recoverable iron in the river. TDS values in the river would increase under <br />rare low flow conditions. <br />The pH of the North Fork of the Gunnison River varies from 7.5 to 8.8 according to <br />the 2007 AHR. The average pH of the mine discharge water is 8.4. Therefore, the <br />mine discharge water should not adversely affect the pH in the North Fork of the <br />Gunnison River. See the following table for addition PHC analysis. <br />TR-54 2.05 - 73 12/08 <br />~ PpRdv~ <br />I/~~~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.