My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-09_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2008-12-09_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:45 PM
Creation date
2/27/2009 9:27:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
12/9/2008
Doc Name
pg 2.05-59 to 2.05-126
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.6(6) <br /> <br />Subsidence Monitoring <br />Monument Location Frequency Purpose <br />17-A Hubbard Creek Quarterly <br />17-B Hubbard Creek Quarterly <br />17-C Hubbard Creek Quarterly <br />To confirm subsidence does not <br />17-D Hubbard Creek Quarterly occur in the limited extraction zone <br />17-E Hubbard Creek Quarterly along Hubbard Creek <br /> <br />17-F <br />Hubbard Creek <br />Quarterly . <br />17-G Future Quarterly <br />17-H Future Quarterly <br /> <br />24-D Quarterly <br />24-E Monuments are Quarterly <br />24-F located above Quarterly <br />24-G the west D-Seam Quarterly <br />25-A and west B- Quarterly To determine subsidence over <br />25-B Seam panels. Quarterly multiple seam mining. The <br />25-C The D-Seam Quarterly subsidence monuments will have <br />25-D panels were Quarterly pre-longwall mining base line <br />25-E numbered WD-1, Quarterly measurements, post D Seam <br />25-F WD-2 & WD-3 Quarterly longwall mining measurements and <br />26-A and were mined Quarterly post B Seam longwall mining <br />26-B from 3/04 to Quarterly measurements. <br />26-C 3/05. The B- Quarterly <br />26-D Seam panels Quarterly Monitoring of these 20 monuments <br />26-E were numbered Quarterly will cease October-2008. <br />26-F B-1, B-2 & B-3 Quarterly <br />26-G and were mined Quarterly <br />27-A from 4/05 to Quarterly <br />27-B 10/06. Quarterly <br />27-C Quarterly <br />• 'Seasonal access difficulties usually restrict quarter monitoring to three times per year. <br />PR-11 <br />2.05 - 125 - <br />11 /08 <br />~ PPRov~p <br />I z,~ ~q/a S <br />
The URL can be used to link to this page
Your browser does not support the video tag.