Laserfiche WebLink
(3)(c) No administrative or judicial actions. <br />(3)(d) The violation has been abated. <br />(3)(e) The applicant provided a geotechnical analysis that demonstrated a factorof safety <br />of the in place and proposed coal mine waste bank no. 2 is 1.5 or greater. The <br />results of the stability study required that the slopes of the refuse pile be no steeper <br />than 5h:1 v with 15' wide terraces on 50' intervals with the first 50 foot bench sloped <br />no steeper than 2.5h:1v. <br />(3)(f) The notice of violation was terminated by the Division of Minerals and Geology <br />on June 16, 2005 <br />Permit Renewal ~2 2.03-13i <br />n7 k' -SO <br />APPRovEp <br />7~31~0~ <br />02/07 <br />