My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-25_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2009-02-25_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:52 PM
Creation date
2/26/2009 3:52:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
2/25/2009
Doc Name
2008 ARR Response to Divisions Review
From
Colowyo Coal Company
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Colowyo's Comments - 20 January 2009 Partial Inspection Report <br />Hydrologic Balance: The Division made notes in the inspection report that refer to the five <br />sumps located in Taylor Draw. Colowyo would like to clarify the status of the five sumps <br />mentioned within this section of the inspection report since these sumps have been labeled <br />and managed as Best Management Practices (BMP's). Colowyo wants to ensure these <br />sumps remain classified as BMP's and not permitted structures. <br />Backfilling and Grading: The Division commented that "The Operator was performing <br />backfilling and operations in the Section 4 area of the west Pit at the time of the inspection. <br />The operator was loading spoil from a temporary pile with a loader and dumping it along the <br />east edge of the pit just above the East Taylor Pond. The Material was then being pushed <br />into the pit by a D 11 dozer. A very small portion of the area has reached final contour. No <br />other backfilling operations were being performed in the West Pit. Colowyo agrees with the <br />majority of this observation made by the Division. Colowyo is assuming that the "small <br />portion of the area that has reached final contour" refers to the 42.2 acres of re grade that <br />Colowyo performed in 2007. Colowyo would like to mention that other backfilling <br />operations are on going in the West Pit as witnessed by the majority of this area (Sections <br />3,4 and 9) having been dumped and backfilled very close to final contour so that minimal <br />work will need to be done to complete final re grading of these acres. <br />Topsoil: The large topsoil pile just north and east of the C-C' underdrain of the East Taylor <br />Fill has been dressed and sloped by Bower Brothers. They have also cut a perimeter ditch <br />around the pile to help protect the resource. The pile still needs to be seeded and Ryan <br />indicated that they may still seed it this winter. This topsoil pile is scheduled to be seeded <br />this spring or when conditions allow safe access to and around the pile.
The URL can be used to link to this page
Your browser does not support the video tag.