My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_GENERAL DOCUMENTS - M1984101 (4)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984101
>
2009-01-13_GENERAL DOCUMENTS - M1984101 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:52 PM
Creation date
2/26/2009 2:53:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/13/2009
Doc Name
Referral Response- Additional 3
From
Park County
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will either be discharged to the detention basin illustrated on the Exhibit C map (refer <br />to Exhibit G for a discussion of the basin), or to small, specific. recycle ponds. <br />Life of the Operation <br />It is anticipated that only about three acres, more-or-less, will be mined per year. <br />On the basis of this rate of extraction, the life of the operation is estimated to be about <br />18 years, more or less. However, the actual rates of extraction, and corresponding life <br />of the operation will be based on market demands for the product. <br />Phases of Mining and Reclamation <br />The operation is expected to occur in three phases as follows: <br />PHASE AREA* ESTIMATED TIME PERIOD <br />1 22.9 ac 5 yrs. <br />2 22.9 ac. 6 yrs. <br />3 21.0 ac. 7 yrs. <br /> 66.8 ac.* 18 yrs. <br />The permit area totals 66.8+/- acres. However the actual area to be disturbed <br />is about 63.8+1- acres: Phase 1 = 21.4+1- ac., Phase 2 = 22.2+1- ac., Phase 3 = <br />20.2+/- ac. <br />Concurrent Reclamation <br />Reclamation will occur in conjunction with the mining operation to the extent <br />practicable. It is planned that a maximum of about 21.4 +/- acres of total disturbance <br />(the disturbed area of Phase 1) will occur at any time before reclamation commences <br />and will also be the basis for calculating the financial warranty. <br />Notes <br />1 . Both the Exhibit C and Exhibit F maps show the permit boundary <br />offset slightly from fences located on the south and east sides of the <br />permit boundary. This is for illustration purposes only so that the fence is <br />-6-
The URL can be used to link to this page
Your browser does not support the video tag.