My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_GENERAL DOCUMENTS - M1984101 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984101
>
2009-01-13_GENERAL DOCUMENTS - M1984101 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:52 PM
Creation date
2/26/2009 2:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/13/2009
Doc Name
Referral Response- Additional 1
From
Park County
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />PROJECT IDENTIRCATION <br />Agency or organization name: DMG <br />Task #: 007 State: Colorado <br />Date: 0211912003 County: Park <br />User : JD1 Site : Chaparral Meadows Pd <br />Permit or other job action : Final Reclamation <br />Task description : Mob/demob equipment <br />Permit/job #: M-1984-101 <br />Abbreviation : none <br />Filename : M101-007 <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost hour: $24.34 $26.99 $33.09 <br />Operating cost/hour : $28.49 $30.27 $34.34 <br />Operator cost/hour : $27.07 $27.07 $27.07 <br />Helper cost/hour: $0.00 $23.76 $23.78 <br />Total Unit Cost/hour: $79.90 $108.11 $118.28 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/float Return Trip <br />Cost/hr/fleet DOT permit <br />Ccst/tleet <br />-Cat 06R Series It - BU 53.17 $50.76 $118.28 1 $169.04 $118.28 $0,00 <br /> <br />-Cat 637G <br />57,38 <br />$75.69 <br />$118.28 <br />1 <br />$193.97 <br />$11828 _ <br />$0.00 <br />-Seeding equipment 10.00 $20.00 $79.90 1 $99.90 $79.90 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: $462.91 $316.46 $0.00 <br />ROADABLE EQUIPMENT <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest maj or city or town within project area region : Fairplay <br />Transportation Cycle Time : Nor- Total one-way travel distance : 200 miles <br /> Roadable Roadable Average travel speed : 50.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.40 0.40 Total non-roadable mob/demob cost $3,400.95 <br />Return time (hours) = 0.40 0.40 • two round trips with haul rig <br />Loading time (hours) = 1.50 NA Total roadable mob/demob cost " : $0.00 <br />Unloading time (hours) = 1.50 NA •• one round trip, no haul rig <br />Subtotals = 3.80 6.80 <br />I <br />JOB TIME AND COST Total job time : 7.60 hours <br />Total job cost : $3,401
The URL can be used to link to this page
Your browser does not support the video tag.