My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-18_PERMIT FILE - M2009010 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009010
>
2009-02-18_PERMIT FILE - M2009010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:42 PM
Creation date
2/26/2009 12:59:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009010
IBM Index Class Name
PERMIT FILE
Doc Date
2/18/2009
Doc Name
Adequacy Response
From
Grasser Construction & Paving, LLC
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action : NEW 110 APPLICATION <br />Task description : CUT SLOPES TO 4:1 <br />.......................... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series II - 8U (2005) Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.31 NA <br /> Operating cost/hour : $77.43 100 <br /> Ripper op. cost/hour : $3.40 40 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $171.91 Total fleet cost/hour : $171.91 <br /> <br />MATERIAL QUANTITIES . _. <br />Initial Swell Loose <br />volume : 10,890 BCY factor : 1.250 volume : 13,612 LCY <br /> <br />Source of estimated volume: EXHIBIT "D" <br />Source of estimated swell factor :EXHIBIT "D" <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.02 (Cat HB) <br />Average push gradient : 1.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 3,470 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.55 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 220.43 LCY/hr <br /> Adjusted fleet production : 220.43 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 61.75 Hours <br />Unit cost : $0.780 /LCY Total job cost : $10,616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.