My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-24_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2009-02-24_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:50 PM
Creation date
2/26/2009 12:57:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
HYDROLOGY
Doc Date
2/24/2009
Doc Name
Proposed Groundwater Monitoring Plan
From
DRMS
To
Holcim, (US) Inc
Permit Index Doc Type
Hydrology Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portland Plant Holcim (US) Inc. Phone 719 784 6325 <br />• 3500 Highway'120 Fax 719.784.3470 <br />' Florence, CO 81226 www.bolcim.comhrs <br />February-17, 2009 <br />Mr. Berhan Keffelew <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 :Sherman Street,, Room 215 <br />Denver, CO 80203 <br />Re: Proposed Groundwater Monitoring Plan,. DBMS<Permit M-1977=344 <br />Dear Mr. Keffelew, <br />The purpose of this groundwater monitoring plan (GMP) is to fulfill the requirements of <br />Technical Revision ##6 (TR-06) to the Division of Mining, Reclamation and Safety.Permit M- <br />1977-344. This. permit'is_forthe Holcim (US) Portland Plant.quarry located,adjacent to the <br />cement plant in Florence, Colorado. <br />The quarry is located on the north side of the Arkansas River. Groundwater in the area flows in <br />a generally southerly direction toward the river. See Figure 2 attached from the March 2008 <br />Groundwater Monitoring Report. <br />Holcim proposes annual sampling of the following monitoring wells: <br />• MW-12 -.Background well located in the north end of the quarry. <br />•, MW-7 Compliance well located in the southwest side of the quarry, <br />• MW-13* - Compliance well to be located in the south side of the quarry in close proximity <br />to Piezometer P-3 near the entrance to the quarry. <br />* Note, this well is proposed to be: drilled in April 2009 and will be a 2" ID Schedule 40 PVC. well <br />approximately 50 feet in depth: <br />ln'addition, Hplcim will continue monitoring water level in wells P-2;.P=3; MW=9; and W-11. <br />Holcim proposes abandoning the following wells: <br />MW-6 ;.-this well is located next to MW12. and,is thus redundant and, unnecessary. <br />MW-8.- this well is located'in an area that will be reclaimed, _i.e., buried, in 2009. <br />MW-10.- this well, is too shallow:to provide useful data. <br />The: wells will be abandoned in accordance with Colorado, rules and. regulations governing:well <br />abandonment.
The URL can be used to link to this page
Your browser does not support the video tag.