My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-30_INSPECTION - M1983175
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1983175
>
2009-01-30_INSPECTION - M1983175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:16 PM
Creation date
2/25/2009 2:43:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983175
IBM Index Class Name
INSPECTION
Doc Date
1/30/2009
Doc Name
Request extension to correct PV
From
LJ Development, Inc.
To
DRMS
Inspection Date
9/26/2007
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSUME THE DEPTH OF SCRAP STEEL TO BE 4 FEET HIGH IN THE DESIGNATED AREAS <br />ASSUME THAT THE SURFACE IN THE SELECTED AREA IS 40016 COVERAGE <br />40% SURFACE COVER 3.44 1.38 AC <br />1.38ACRES 4FEET DEEP 8,906 CY SCRAPSTEEL <br />MARKET PRICE OF SCRAP STEEL JANUARY 21, 2009 $130.00 QUOTE FROM DEALER <br />The complete Exhibit "L" is attached to this report for your review and comments. An <br />abbreviated summary is shown below: <br />RECLAMATION COST <br />TASK ALAMOSA PIT # 2 <br />001 <br />002 <br />003 <br />004 <br />005 <br />007 <br />006 <br />008 <br />VOLUME NEEDED TO FILL POND TO REQUIRED LEVEL <br />BORROW MATERIAL FROM SITE TO FILL PONDS <br />IMPORT BACKFILL FOR PONDS 10 MILE HAUL <br />IMPORT TOPSOIL & SPREAD <br />RIPPING NOT REQUIRED DUE TO STRIPPING THE SITE <br />REVEGETATION <br />REMOVE DEBRIS SCRAP STEEL & OTHER METALS <br />MOBILIZATION & DEMOBILIZATION <br />TOTAL DIRECT COST <br />INDIRECT COST <br />PUBLIC LIABILITY INSURANCE <br />CONTRACTOR PERFORMANCE BOND <br />CONTRACTOR PROFIT <br />DIVISION ADMIN. COST <br />ADDITIONAL SUPERVISION <br />TOTAL BOND AMOUNT <br />* Salvage value of scrap steel after expenses. <br /> EXTENDED <br />QTY. UNIT UNIT COST COST <br /> <br />182807 CY Q4tfY PER: __F <br />64533 CY $1.50 $96,800 <br />118274 CY $4.50 $532,233 <br />22266 CY $7.00 $155,862 <br />0 CY $0.00 $0 <br />40 AC $1,034.98 $41,399 <br />4233 TONS -$97.88 -$414,312- <br />1 LS $3,481.00 $3,481 <br /> $415,462 <br /> 1.55% $6,440 <br /> 1.55% $6,440 <br /> 10.00% $41,546 <br /> 5.00% $20,773 <br /> 1.25% $5,193 <br />1 LS BOND COST $490,661 <br />Please find additional information attached to this report that was used in the calculations. <br />Details can be found on EXHIBIT "L". ATTACHED.
The URL can be used to link to this page
Your browser does not support the video tag.