My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-02-04_REVISION - C1981013 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981013
>
1997-02-04_REVISION - C1981013 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 10:13:53 AM
Creation date
2/24/2009 2:34:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
REVISION
Doc Date
2/4/1997
Doc Name
Final Reclamation Reports
From
Basin Resources, Inc
To
DRMS
Type & Sequence
MR5
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ STATE OF COLORADO <br /> MINED LAND RECLAMATION DIVISION r1 C LE I d'L D <br /> ooprlmom d NNunl nuowna <br /> M2 ahWMM 6t..Room 215 <br /> f f <br /> a°a i aee03 FEB 0 41997 <br /> FAX: 303 $39-8106 _. <br /> uit,i5ion of ivunerals&Geology F°, `Re,,, <br /> oNWa+Dkww <br /> COAL EXPLORATION FINAL RECLAMATION REPORT <br /> PROSPECTORS BASIN RESOURCES, INC. NOTICE OF INTENT NO. : C-81-013 MR-05 <br /> ADDRESS: 14300 HIGHWAY 12 PROJECT NAME:INSTALLATION OF DEGAS WELLS <br /> WESTON, COLORADO 81091 COUNTY: LAS ANIMAS <br /> DATE: DECEMBER 19, 1996 <br /> This report is filed in accordance with Rule 2.02.6(3)(b) of the Regulations of the <br /> Colorado Mined Land Reclention Board for Coal Mining adopted in accordance with <br /> the Colorado Surface Coal Mining Act, C.R.S. 34-33-101 at sea. The report is to be <br /> submitted to the Division within 30 days after the end o? W period of exploration <br /> specified in the approved Notice of Intent, as amended. <br /> i. Attach a map showing: <br /> a.) The final locations of ail holes drilled during this project; <br /> b. The locations of all roads modified or constructed for the <br /> project; and <br /> c. I All areas significantly disturbed by the operator. <br /> 2. Heve all disturbed areas, including drill holes, been reclaimed in <br /> accordance with the approved plan and the above-referenced regulations? NO <br /> 3, Were any newly constructed protect roads retained for the landowner? YES <br /> If yes, a) attach a letter from the landowner that grants consent, b) Indio <br /> the road location on a map, and c) describe the approximate specifications of <br /> the road (width, length, surface material used). <br /> 4. Did ally drill holes experience surface artesian flow conditions? NO <br /> If yes, locate these holes on a no and describe sealing and plugging <br /> procedures that were used. <br /> S. were any drill holes converted to a water well? NO If yes, list the <br /> State Engineer's Well Permit Number and name and address of the user. <br />
The URL can be used to link to this page
Your browser does not support the video tag.