My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-09_PERMIT FILE - C1996083 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2008-12-09_PERMIT FILE - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:45 PM
Creation date
2/24/2009 9:51:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
12/9/2008
Doc Name
In Dove Gulch Area for New Layout, Maleki Technologies, December 2007
Section_Exhibit Name
Volume IIIA Exhibit 17 Prediction of Surface Deformation Resulting From Longwall Mining
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maleki, H. and W. Koontz, 1999, Case Studies of Progressive Pillar Failure in Two <br />Mines using Wide Pillars, 19~' International Conference in Ground Control in Mining, <br />WV University, pp 278-285. <br />Carrol C. 2003. Fractures in the Mesa Verde Group at Somerset Coalfield, Delta and <br />Gunnison Counties, Co, Co Geological Survey, Denver, Co. <br />Tifft R. 1995. Unpublished report. <br />Kiger 2004, personal communications. <br />Cragg 2005, personal communications. <br />MTI 2004, Overburden Stability Evaluation at Terror Creek Crossing, Internal report <br />prepared by Maleki Technologies, Inc. for BRL. <br />Stewart C., 2006. A Determination of Angle of Draw D-Seam Longwall Mining, BRL <br />internal report. <br />Disclaimer <br />Other supporting data and information relied upon during the course of this investigation <br />and used in preparation of this report was provided by BRL including geologic data, rock <br />mechanic tests, available subsidence monitoring effects, published reports and literature <br />and personal communications with BRL staff and other contractors. MTI makes no <br />representation or warranty of the accuracy of the data used in preparation of this report. <br />Maleki Technologies, Inc. Page 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.