Laserfiche WebLink
ACCELERATION (g) <br />0 0.2 0.4 0.6 <br />0 <br />8 <br />16 <br />24 <br />_ 32 <br />U-1 <br />L- 40 <br />cn 48 <br />Li <br />ct, <br />U <br />56 <br />0 <br />J <br />w 64 <br />m <br />72 <br />0 <br />80 <br />88 <br />96 <br />104 <br />112 <br />0.8 1 <br /> <br /> <br /> ?? <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> _ ?.. _ AVERAGE MAXIMUM <br /> ACCELERATION <br /> ?- YIELD ACCELERATION <br /> <br />NEW <br />EMBANKMENT <br />OLD <br />EMBANKMENT <br />FOUNDATION <br />SOILS <br />I <br />BEDROCK <br />BOWIE RESOURCES, LTD. BRUCE PARK DAM PROJECT YIELD ACCELERATION AND <br />DELTA COUNTY, COLORADO ACCELERATION OF MAIN DAM AVERAGE GEI Consultants, Inc. PROJECT NO. 99292 JUNE 2002 FIGURE 3.4