Addendum to Geotechnical Data Report <br />Bowie Resources, Limited <br />July 2002 <br />I* , <br />Drilling of borings in an existing landslide, which is on the right side of the reservoir, did not <br />occur during the original investigation due to permitting, access, and time restrictions <br />imposed by the U.S. Forest Service. <br />Drilling of a boring in the upstream slope of the main dam was requested by the Office of the <br />State Engineer after completion of our original program. This was requested because based <br />on available records, organics were identified, removed, and the excavated area, which is on <br />the upstream slope of the main dam near the right abutment, was replaced with fill in 1986. <br />The purpose of drilling a boring in the upstream slope was to identify if any major quantities <br />of organics still exist in this part of the upstream slope of the dam. <br />1.4 Project Personnel <br />The following personnel from GEI are responsible for the work summarized herein: <br />Project Manager Robert J. Huzjak, P.E. <br />Staff Geotechnical Engineer Edwin Friend, E.I.T. <br />Technical Review Gonzalo Castro, Ph.D. <br />Mr. Gregory L. Hunt of Bowie Resources, Ltd. and Mr. John Mathewson of Terror Ditch and <br />Reservoir Company provided assistance and information during the project. <br />LI <br />GEI Consultants, Inc. 2 99292 02-07-03 Addendum Geotechnical Data Rpt