Laserfiche WebLink
• <br />0) <br /> <br />Addendum to Geotechnical Data Report <br />Bowie Resources, Limited <br />July 2002 <br />TABLE 5.1 <br />MAIN DAM AND SADDLE DAM GROUNDWATER LEVELS <br />ON MAY 7, 2002 <br /> Depth to Piezometer <br />Boring Water Installation <br />No. Location (FT) (Zone of Influence) Subsurface Material <br />MAIN DAM <br />BD-101 Left Abutment N/A 11.0 - 20.0 feet New Embankment <br />BD-103 Center D/S 33.7 37.0 - 53.0 feet Foundation Soils <br /> Toe <br />BD-105 Center Crest 84.4 72.0 -113.5 feet Foundation Soils <br />BD- Center. Crest 29.4 26.0 - 40.0 feet New Embankment and <br />105A Old Embankment <br />SA DDLE DAM <br />BS-102 Center Crest 6.2 21.5 - 43.0 feet New Embankment and <br /> L Bedrock <br />Note: <br />(1) Locations described based on view looking downstream (D/S). <br />GEI Consultants, Inc. <br />2 99292 02-07-03 Addendum Geotechnical Data Rpt