Laserfiche WebLink
?J <br />0) [10 <br /> BD-105A <br /> LOG OF DRILL HOLE <br />GEI Consultants, Inc. PAGE: 1 OF 1 <br />PROJECT NAME :Bruce Park Dam <br />DATE: 11/26/00 / 11/26/00 <br /> LEGEND <br />PROJECT NUMBER: 99292 1) BLOWS PER 6 IN.-140 LB. HAMMER FALLING 30 IN. TO DRIVE A <br />BORING LOCATION : Main Dam Center Crest 2.0 IN. OD SPLIT SPOON SAMPLER <br /> 2) PEN - PENETRATION LENGTH OF SAMPLER OR CORE BARREL <br />GROUND SURFACE ELEVATION (NGVD - FT) `8187 3) REC - RECOVERY LENGTH OF SAMPLE <br />GROUNDWATER ELEVATION : DRY DATE 12/12/00 S - SPLIT SPOON SAMPLE 1-3/8 in. I.D. ST - SHELBY TUBE <br /> C - CONTINUOUS DRY CORE SAMPLER 3-1/4 in. I.D. <br />it <br />DRILLED BY:_ A9aPo Drilling, Inc. <br /> GROUNDWATER = ESTIMATED GROUNDWATER a <br />LOGGED BY: JDG TOTAL DEPTH (Fr): 40.0 <br />NOTES: Rig: Acker MP-5 (Track-mounted) Open standpipe piezometer installed in completed hole; <br />Casing: 4-1/4 in. I.D. Hollow Stem Auger see piezometer log for details <br /> I SAMPLE v <br />DEPTH <br /> TYPE 1 -BLOWS - 2 - - 3 - REMARKS a.0 SOIL AND ROCK DESCRIPTIONS <br />FT. and PER PEN REC -1 <br /> NO. 6 IN. IN. IN. . 0 <br />-15 <br />-20 <br />-25 <br />-30 <br />-35 <br />-40