Laserfiche WebLink
Geotechnical Data Report Bruce Park Dam <br />Bowie Resources, Limited <br />April 2001 <br />never removed and replaced with embankment materials. The materials were left in place <br />based on the State Irrigation Division Engineer's evaluation of the embankment performance <br />during the filling of the reservoir. No borings were drilled in this area to evaluate these <br />materials or confirm the SEO records. <br />4k <br />2 <br />GEI Consultants, Inc. 20 99292 01-04-16 Geotechnical Data Repot