My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-24_PERMIT FILE - C1996083A (13)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2008-11-24_PERMIT FILE - C1996083A (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:14 PM
Creation date
2/23/2009 4:26:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/24/2008
Doc Name
pg 2.05-59 to 2.05-125
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.6 <br />each year a sample will be obtained and analyzed for the parameters on List 2. <br />Stephens Draw will be monitored quarterly at the designated upstream and <br />downstream monitoring locations shown on Map 9. Field parameters will be <br />measured each quarter. A full suite sample from List 1 will be obtained semi- <br />annuallyduring the second and fourth quarters. <br />Gulches A, B, C, & D will be monitored quarterly at the designated upstream and <br />downstream monitoring locations shown on Map 9 exceptA-Gulch does not have an <br />upstream monitoring point. Field parameters will be measured each quarter. A full <br />suite sample from List 1 will be obtained semi-annually during the second and fourth <br />quarters. <br />Alluvial wells 1 through 9, 11, 12 and 14 through 17 will be monitored quarterly for <br />field parameters. A full suite sample will be obtained semi-annually during the <br />second and fourth quarters. <br />Culverts 1 through 4 will be monitored quarterly for field parameters. A full suite <br />sample from List 1 will be obtained semi-annually during the second and fourth <br />quarters. <br />The sediment ponds will be monitored in accordance with discharge permit <br />requirements. During August of each year a sample will be obtained and analyzed <br />for the parameters on List 2 if the sediment ponds discharge. <br />Mine inflows will be measured semi-annually for field parameters. An annual full <br />suite analysis will be obtained for any point source of inflow greater than 5 gallons <br />per minute. Results of the mine inflow monitoring including a seep location map and <br />seep rate of flow will be submitted with the annual hydrologic report. <br />Mine inflows will be measured for field parameters in the limited extraction zone <br />beneath Hubbard Creek. An annual full suite analysis will be obtained for any poirit <br />source of inflow greater than 5 gallons per minute. Monitoring and reporting shall be <br />on a monthly basis until it is established that the development mining beneath <br />Hubbard Creek is not affecting the creek. <br />Small area exemptions shown on Map 20 will be monitored quarterly. The Applicant <br />will use its best efforts to obtain samples. The samples will be analyzed for pH, <br />conductivity and total settleable solids. Samples will be in compliance if they contain <br />settleable solid levels of 0.5 ml/I or less and the pH is greater than 6.5 and less than <br />9.0. <br />The following pages list the water monitoring stations. <br />• <br />PR-10 2.05 - 78 01/08 <br />.AfRRov~l~ <br />~i~~wlo ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.