My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-23_HYDROLOGY - M1984108
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1984108
>
2009-02-23_HYDROLOGY - M1984108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:47 PM
Creation date
2/23/2009 3:50:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984108
IBM Index Class Name
HYDROLOGY
Doc Date
2/23/2009
Doc Name
Substitute water supply plan
From
Western Gravel, Inc.
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contracting Officer's Office of Civil Rights. <br />K. MEDIUM FOR TRANSMITTING PAYMENTS <br />All payments from the Contractor to the United States under this contract shall be by the medium <br />requested by the United States on or before the date payment is due. The required method of <br />payment may include checks, wire transfers, or other types of payment specified by the United <br />States. <br />L. CONTRACT DRAFTING CONSIDERATIONS <br />Articles 1 through 5 of this Contract have been drafted, negotiated, and reviewed by the parties <br />hereto, each of whom is sophisticated in the matters to which this Contract pertains, and no one <br />party shall be considered to have drafted the stated articles. <br />M. CONSTRAINTS ON THE AVAILABILITY OF WATER (WATER SHORTAGES) <br />(a) In its operation of the Project, the Contracting Officer will use all reasonable means <br />to guard against'a Condition of Shortage in the quantity. of water to be made'available to the <br />Contractor pursuant to this Contract. In the event the Contracting Officer determines that a <br />Condition of Shortage appears probable, the Contracting Officer will notify the Contractor of <br />said determination as soon as practicable. <br />(b) If there is a Condition of Shortage because of errors in physical operations of the <br />Project, drought, other physical causes beyond the control of the Contracting Officer or actions <br />taken by the Contracting Officer to meet current and future legal obligations, then.no liability <br />shall accrue against the United States. or any of its officers, agents, or,employees for any damage, <br />direct or indirect;: arising therefrom.
The URL can be used to link to this page
Your browser does not support the video tag.