My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-20_PERMIT FILE - C1996083
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2007-03-20_PERMIT FILE - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:37 PM
Creation date
2/23/2009 1:51:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
3/20/2007
Doc Name
11/10/2003 Geotechnical Engineering Study, Lambert & Assoc, (Gob Pile)
Section_Exhibit Name
Volume IX Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I~ <br />I • <br />LJ <br />IM_ PORTANT INFORMATION <br />- ABOUT YOUR <br />GEOTECHNICAL ENGINEERING REPORT <br />More construction problems are caused by site subsur- . <br />face conditions than any other Factor. As troublesome as <br />subsurface problems can be. their frequency and extent <br />have been lessened considerably in recent years, due in <br />large measure to programs and publications of ASFE/ <br />The Association of Engineering Firms Practicing in <br />the Geosciences. <br />The following suggestions and observations are offered <br />to help you reduce the geotechnical-related delays, <br />cost-overruns and other costly headaches that can <br />occur during a construction project. <br />A GEOTECHN[CAL ENGINEERING <br />REPORT IS BASED ON A• UNIQUE SET <br />OF PROJECT-SPECIFIC FACTORS <br />A geotechnical engineering report is based on a subsur- <br />face exploration plan designed to incorporate a unique <br />set of project-specific factors. These typically include: <br />the general nature of the structure involved. its size and <br />configuration; the location of the structure on the site <br />and its orientation; physical concomitants such as <br />access roads, parking lots, and underground utilities, <br />and the level of additional risk which the client assumed <br />by virtue of limitations imposed upon the exploratory <br />program. To help avoid costly problems, consult the <br />geotechnical engineer to determine how any factors <br />which change subsequent to the date of the report may <br />affect its recommendations. <br />Unless your consulting geotechnical engineer indicates <br />otherwise. your geotechnical engineering report should not <br />be used: <br />• When the nature of the proposed structure is <br />changed. for example. if an office building will be <br />erected instead of a parking garage. or if a refriger- <br />ated warehouse will be built instead of an unre- <br />frigerated one: <br />• when the size or configuration of the proposed <br />structure is altered: <br />• .when the location or orientation of the proposed <br />structure is modified: <br />. ~.vhen there is a change of ownership, or <br />• for application [o an adjacent site. <br />Geotechnical engineers cannot accept responsibility for problems <br />which may develop if they are not consulted after factors consid- <br />ered in their report> development have changed. <br />MOST GEOTECHNICAL "FINDINGS" <br />ARE PROFESSIONAL ESTIMATES <br />Site exploration identifies actual subsurface conditions <br />only at those points where samples are taken, when <br />they are taken. Data derived through sampling and sub- <br />sequent laboratory testing are extrapolated by geo- <br />technical engineers who then render an opinion about <br />overall subsurface conditions. their likely reaction to <br />proposed construction activity, and appropriate founda- <br />tion design. Even under optimal circumstances actual <br />conditions may differ from those inferred to exist, <br />because no geotechnical engineer, no matter how <br />qualified. and no subsurface exploration program, no <br />matter how comprehensive. can reveal what is hidden by <br />earth, rock and time. The actual interface between mate- <br />rials may be Far more gradual or abrupt than a report <br />indicates. Actual conditions in areas not sampled may <br />differ from predictions. Nothing can be done to prevent the <br />unanticipated. 6u[ steps can be taken to help minimize their <br />impact. For this reason, most experienced owners retain tfieir <br />geotechnical consultnnts through the construction stage, to iden- <br />tify variances, conduct additional tests which may be <br />needed. and to recommend solutions to problems <br />encountered on site. <br />SUBSURFACE CONDITIONS <br />CAN CHANGE <br />Subsurface conditions may be modified by constantly- <br />changing natural forces. Because a geotechnical engi- <br />neering report is based on conditions which existed at <br />the time of subsurface exploration, construction decisions <br />should not be based ~~n a geotechnical engineering report whose <br />adequacy may Have been affected by time. Speak with the geo- <br />technical consulrmt to learn if additional tests are <br />advisable before construction starts. - <br />Construction operations at or adjacent to the site and <br />natural events such as floods, earthquakes or ground- <br />water fluctuations may also affect subsurface conditions <br />and, thus. the continuing adequacy of a geotechnical <br />report. The geotechnical engineer should be kept <br />apprised of any such events, and should be consulted to <br />determine iF additional tests are necessary <br />GEOTECHNICAL SERVICES ARE <br />PERFORMED FOR SPECIFIC PURPOSES <br />AND PERSONS <br />Geotechnical engineers reports are prepared to meet <br />the specific nerds of specific individuals. A report pre- <br />pared for a consulting civil engineer may not be ade- <br />quate for a construction contractor. or even some other <br />consulting civil engineer. Unless indicated otherwise, <br />this report was prepared expressly for the lien[ involved <br />and expressly for purposes indicated by the client, Use <br />by any other persons Eor any purpose. or by the client <br />for a different purpose. may result in problems. No indi- <br />vidualother than the client should apply this report for its <br />intended purpose without first conferring with the geotechnical <br />engineer. No person should apply this report for any purpose <br />other than that origircatl y carcizmp(ated without first conferring <br />with the geotechnical engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.