My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-10_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2008-11-10_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:50 PM
Creation date
2/23/2009 1:50:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/10/2008
Doc Name
Volume IX TOC and Information
Section_Exhibit Name
Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The fill material shall be free of sod, large roots, other large vegetation matter <br />and frozen soil, and in no case shall coal-processing waste be used in <br />embankment construction. <br />The placing and spreading of fill material shall be started at the lowest point of <br />the foundation. Materials will be spread in layers approximately 12 inches deep, <br />and such lifts made uniformly over long stretches and for the full width of <br />embankment. Each lift will be moistened or dried to a uniform moisture content <br />suitable for maximum compaction. Hauling equipment will be routed both ways <br />over the fill and routing varied sufficiently to achieve uniform compaction. <br />Compaction will be carried to the edge of the fills so that the final slopes are firm. <br />The embankment shall be constructed so the design height is achieved at all <br />times, including the period after settlement. The combined upstream and <br />downstream side slopes of the settled embankment shall not be steeper than <br />5h:1v, with neither slope steeper than 2h:iv. <br />Since Pond F is a dugout pond, DMG rule 4.05.9(8) should not apply. <br />Faces of the embankments including the surrounding areas disturbed will be <br />vegetated to enhance stability. The height of the embankment is less than 10 <br />feet in vertical height measured from the bottom of the channel to the bottom of <br />the spillway. Anti-seep collars will be installed to control seepage along conduits <br />that extend through the embankment. <br />The Deer Trail Ditch is in a open ditch where Pond F was constructed. The Deer <br />Trail Ditch was placed in a 30-inch diameter culvert where it passes through the <br />Pond F embankment. The culvert was buried approximately 24-inches deep. <br />TR-44 - 8 - 02/07 <br />!1 PPRoV60 <br />3/zo/a-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.