Laserfiche WebLink
TABLE OF CONTENTS <br />. V. MINE SURFACE FACILITIES RECLAMATION PLAN ....................................................V-1 <br />V.A Water Quantity and Quality Control Plan ...............................................................V-1 <br /> V.A.1 Water Quantity Control Plan ......................................................................V-1 <br /> V.A.2 Water Quality Control Plan ...................................................................... ...V-4 <br />V.B Design, Construction and Operation of Ponds and Waste Banks ...................... ...V-5 <br /> V.B.1 General V-5 ........................................................................................... ...V-5 <br /> V.B.2 Dewatering Mechanics ............................................................................ ...V-5 <br /> V.6.3 Disposal Site Characteristics ................................................................... ...V-7 <br /> V.B.4 Sedimentation Ponds Design .................................................................. ...V-8 <br /> V.B.5 Waste Banks Design ............................................................................... .V-12 <br /> V.6.6 Post Reclamation Sediment Control ....................................................... .V-14 <br />V.C Diversions ............................................................................................................ .V-15 <br />V.D Storage and Disposal of Acid-Forming, Toxic-Forming and Combustible <br /> Materials .............................................................................................................. .V-16 <br />V.E Disposal of Mine Development Waste ................................................................ .V-17 <br />V.F Sealing of Mine Openings and Drill Holes ........................................................... .V-17 <br />V.G Backfilling and Contouring ................................................................................... .V-21 <br /> V.G.1 Revegetation Study with Various Topsoil Depths ................................... .V-22 <br />V.H Removal, Storage and Redistribution of Topsoil ................................................. .V-23 <br />V.I <br />• Revegetation ........................................................................................................ <br />V.1.1 Introduction .............................................................................................. .V-29 <br />.V-29 <br /> V.1.2 General Specifications and Environmental Limitations .......................... .V-30 <br /> V.1.3 Phases and Timing .................................................................................. .V-32 <br /> V.1.4 Site Preparation Techniques and Materials .............................................V-35 <br /> V.1.4.a Seed Selection ......................................................................... .V-35 <br /> V.1.4.b Fertilizer .....................................................................................V-37 <br /> V.1.4.c Mulch ........................................................................................ .V-37 <br /> V.1.4.d Seedbed Preparation ................................................................V-38 <br /> V.1.4.e Seeding Operations ..................................................................V-39 <br /> V.1.4.f Planting Time ........................................................................... .V-39 <br /> V.1.4.g Evaluation and Follow-up ..........................................................V-45 <br /> V.1.4.h Riparian Revegetation ............................................................... V-45 <br /> V.1.4.i Remedial Treatment of Refuse Area 1 ..................................... V-48 <br />V.J Determination of Revegetation Success .............................................................. V-53 <br /> V.J.1 Introduction ............................................................................................... V-53 <br /> V.J.2 Revegetation Success Criteria ................................................................. V-54 <br /> V.J.3 Sampling Methodology for Determining Revegetation Success ............. V-63 <br /> V.J.4 Literature Cited (Sections I and J) ............................................................ V-65 <br />V.K Reclamation Cost Estimate .................................................................................. V-66 <br />V.L Weed Management .............................................................................................. V-67 <br />• <br />Technical REwision #65 (4/2008) <br />