Laserfiche WebLink
1.0 Introduction <br />A water quality monitoring program was initiated at the Edna Mine to monitor specific <br />chemical characteristics of Trout Creek and the alluvium associated with Trout Creek which <br />may be affected by mining and reclamation operations. This program is detailed enough to <br />describe seasonal variations in concentration levels of the parameters monitored, as well as <br />indicate if mining activities and/or reclamation activities are impacting the natural seasonal <br />fluctuations. <br />The purpose of this report is to provide updated information pertaining to the on-going <br />hydrologic monitoring program developed for the Edna Mine and discuss trends in surface <br />and ground water quality. The previous report, dated February 2008, reported monitoring <br />activities up through the end of 2007. This report provides a discussion on each of the <br />parameters monitored which have been collected through 2008. <br />The report is divided into several sections including: Hydrologic Monitoring Network; <br />' Surface Water; Ground Water; Surface Water and Ground Water Interactions; Quality <br />Assurance; Spring and Seep Survey; and Moffat Stability Monuments. <br />' 2.0 Hydrologic Monitoring Network <br />' The present monitoring network is a modification of the network used during baseline <br />monitoring. Continuous streamflow records are made for Trout Creek above the mine (TR-a) <br />from May through October (periods of freezing sometimes necessitate the records to be of <br />' shorter duration). Instantaneous streamflow was recorded on Trout Creek below the Moffat <br />mining area at TR-b prior to July 1994. During June 1994, a continuous streamflow recorder <br />was installed at TR-b. Therefore, monitoring data after June 1994 has been collected on the <br />same schedule as at TR-a. Surface water samples are collected above and below the mine at <br />TR-A and TR-D, respectively. Additional surface water sampling sites along Trout Creek are <br />TR-B (located adjacent to the East Ridge area) and TR-C (located adjacent to the Moffat <br />area). <br />' Ground water levels and samples are collected from four wells. Three wells are completed in <br />the alluvium along Trout Creek (TR-1.5, TR-3 and TR-4) and one well is completed in the <br />spoils (WR-1) located at the base of the West Ridge area. An additional water quality well is <br />completed in the Trout Creek Sandstone (TCS-1) monitored downdip of mining activity. <br />Water monitoring locations are shown on Plate 1. <br />' The samples are analyzed for the parameters listed in Table 4.6-54, Section 4.6.8.4 of the <br />permit. Sampling frequency at the various sites is also listed in Table 4.6-54. Parameters <br />measured in the field include: pH, temperature, and specific conductivity. All other <br />r parameters measured are analytically derived at an independent laboratory.