Laserfiche WebLink
Projected Subsidence Monitoring — 2009 <br /> Through technical revision number 45, the DRMS approved a reduction in subsidence <br /> monitoring. The wide spaced subsidence monuments, Sites 6, 14, 15, 16, DH 55, DH <br /> 65, DH 66, DH 68, 81, 82, 83, 95 and 99 will not be surveyed during 2009. <br /> The operator will survey the seven (7) Pitkin Mesa Pipeline monitoring locations semi- <br /> annually until stability is documented. <br /> • 2 <br />