Laserfiche WebLink
BOWIE RESOURCES-BOWIE NO.1 MINE The Subsidence Monitoring Point PL#5 is located 1,950 feet from recent mining. This point is within <br /> SUBSIDENCE MONITORING DATA-2008 the angle of draw of the Bowie No. 1 Mine workings and was most recently affected by workings <br /> described as Entries in 1996,more than 12 years ago. <br /> STATION : PL#5 ROOF BOLT <br /> DATE NORTHING EASTING EL <br /> EVATION -DOWN/+UP <br /> 7/12/2007 16365.95 10153.79 7448.14 -0.03 <br /> 12/18/2007 16365.97 10153.79 7448.10 -0.04 <br /> 6/24/2008 16365.93 10153.80 7448.16 0.06 <br /> 12/2/2008 16365.97 10153.79 7448.15 -0.01 <br /> MAXIMUM 16367.70 10153.80 7449.59 0.78 <br /> MINIMUM 16364.39 10151.23 7448.03 -1.30 <br /> RANGE 3.31 2.57 1.56 <br />