Laserfiche WebLink
BOWIE RESOURCES-BOWIE NO. 1 MINE The Subsidence Monitoring Point PL#2 is located 2,100 feet from recent mining. This point is within <br /> SUBSIDENCE MONITORING DATA-2008 the angle of draw of the Bowie No.1 Mine workings and was most recently affected by workings <br /> described as Entries in 1996,more than 12 years ago. <br /> STATION : PL#2 ROOF BOLT <br /> DATE NORTHING EASTING ELEVATION -DOWN/+UP <br /> 12/27/2006 1574 5.96 1011 0.03 <br /> 7376.71 -0.15 <br /> 7/12/2007 15746.01 10110.01 7376.82 0.11 <br /> 12/18/2007 15745.96 1010 9.99 7376.82 0.00 <br /> 6/24/2008 15745.89 10109.97 7376.85 0.03 <br /> 12/2/2008 15745.96 <br /> 5 96 1011 0.04 7376.76 <br /> -0.09 <br /> MAXIMUM 15747.12 10110.04 7378.14 0.96 <br /> MINIMUM 15745.89 10107.85 7376.71 -1.28 <br /> RANGE 1.23 2.19 1.43 <br />