Laserfiche WebLink
• <br />Bowie Resources, LLC <br />Bowie No. 1 Mine <br />2008 Annual Hydrology Report <br />Initiated 9/1/1981 9/111981 <br />Activated 9/1/1981 9/1/1981 <br />Date 11/29/2008 6/27/2008 <br /> <br />• <br />Summary Information <br />Baseline <br />B08 <br />Borehole 8 <br />Depth - 38.8' <br />Elevation - 6790' <br />Operation <br />KA;n Avn AA- <br />Static Water Level Feet 38.47 38.80 39.07 38.77 38.8 <br />Water Elevation Feet 6750.9 6751.2 6751.5 6751.23 6751.2 <br />Temperature Celsius <br />Conductivity umhos/cm <br />pH su <br />Field Comments Dry Dry <br />Borehole B-8 is located below the West Ridge Waste Pile sedimentation pond and monitors subsurface <br />groundwater flow from the sedimentation pond. Borehole B-8 is dry. <br />There is no baseline collection possible for points initiated after the influence of mining. <br />Ground Water <br />Figure No. 6 <br />The area of concern for monitoring point 808 was affected by the mining operation before its establishment. Therefore, <br />all recorded monitoring events are considered Operational.