Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />003 State : Colorado Permit/job # : M-2008-076 <br />0211712009 County : Las Animas Abbreviation :none <br />JLE Site : Robinson Sons Gravel Pit No. 1 Filename : M076-003 <br />Permit or other job action :Reclamation Cost <br />Task description : Spread topsoil Over affected area <br />:::::: <br />HOURLY EQUIPMENT ...................................................................................................................................................................................... <br />......................................... <br />COST <br />ipment Description <br />Cost Bre <br />Shift basis : 1 per day <br />Scraper work team -Scraper : Cat 627G <br />-Push dozer :ICat D8R Series Il - 8SU (2005) <br />Support equipment -Load area :INA <br />-Dump area :INA <br />Road maintenance -Motor grader :I CAT 12H <br />-Water truck :I Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA grader misctruk <br />% Utilization-machine : 69 100 NA NA 100 50 <br />-Ripper attachment : NA 0 NA NA 0 NA <br />Ownerhip cost/hour : $55.31 $50.32 NA NA $20.87 $7.53 <br />Operating cost/hour : $84.58 $77.13 NA NA $30.26 $7.73 <br />Ripper op. cost/hour : NA $0.00 NA NA $0.00 $0.00 <br />Operator cost/hour : $24.95 $32.78 NA NA $24.47 $33.94 <br />Unit subtotals : $164.84 $160.22 NA NA $75.60 $49.20 <br />Number of units : 2 1 0 0 1 1 <br />Group subtotals : Work:. $489.90 Support : $0.00 Maintenance : $124.80 <br />Total work team cost/hour : $614.70 <br />...................:..:............ <br />MATERIAL .....................................................................................................................................................................,... <br />.::::::...................................................................................................................................................................... : <br />................................................ <br />QUANTITIES <br />Initial Swell Loose <br />volume : 10,755 LCY factor : NA volume : 10,755 LCY <br />Source of quantity take-off : Spreading 4" of topsoil over 20 acres <br />Source of estimated swell factor : NA