My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-18_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-02-18_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:42 PM
Creation date
2/18/2009 2:25:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
2/18/2009
Doc Name
Adequacy Review
From
DRMS
To
Seneca Coal Company
Type & Sequence
MR29
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />February 18, 2009 <br />Mr. Roy Karo <br />Seneca Coal Company <br />P.O. Box 670 <br />Hayden, Colorado 81639 <br />Re: Yoast Mine (Permit No. C-1994-082) <br />Minor Revision No. 29 (MR-29) <br />PSCO Request to Retain Permanent Ponds - Adequacy Review <br />Dear Mr. Karo: <br />COLORADO <br />D I V I S ION O F <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The Division has completed a preliminary adequacy review of Seneca Coal Company's (SCC's) <br />application for MR-29, and has the following comments and requests. <br />The revision includes a letter from Public Service Company (Xcel Energy) requesting permanent <br />retention of Ponds 011 and 011A, powerlines, and fences, to be incorporated in the permit <br />application package in Attachment 20-1, Appendix 20-1.1. The Division is requesting that SCC <br />include language in Attachment 20-1 of the permit application package that specifically identifies <br />the remaining permitting requirements for permanent structures (as listed below) and commits to <br />satisfying them prior to final bond release. In addition to the required landowner comments, before <br />the features can be approved for permanent retention, the following regulatory requirements need <br />to be addressed: <br />a. For all features, as required by Rule 2.05.5(1)(a)), a description of how the proposed <br />features will be compatible with the approved postmining land use. <br />b. Comments from Routt County (in accordance with Rule 2.05.5(1)(b)) indicating their <br />knowledge of and agreement with retention of all proposed permanent features. <br />C. For the ponds, information addressing the requirements of Rule 4.05.91(13) and, in <br />accordance with Rule 2.05.5(1)(b), documentation that the State Engineer has been <br />contacted and any additional requirements of the State Engineer have been met <br />(dam safety, water rights/augmentation). If there are specific requirements of the <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.