My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-09_REVISION - M2001077
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001077
>
2009-02-09_REVISION - M2001077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:32 PM
Creation date
2/18/2009 9:01:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001077
IBM Index Class Name
REVISION
Doc Date
2/9/2009
Doc Name
2nd adequacy response
From
JSC, Inc.
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of, ?s5 <br />i . <br />JSC INC. ?./ <br />P.O. Box 1153 <br />Meeker, CO 81641 <br />Phone (970) 878-5292 Fax (970) 979-5392 <br />February 6, 2009 <br /> <br />FEB 17 2009 <br />Division of Reclamation, <br />Mining and Safety <br />RECEIVE <br />Travis Marshall FEB 0 9 2009 <br />Environmental Protection Specialist GRAND JUNCT" HELD OFFICE <br />Division of Reclamation, Mining and Safety - Grand Junction Field Office DMSIONOF <br />RECLAMATION MINING & SAFETY <br />101 S. 3`d St. STE: 301 <br />Grand Junction, CO 81501 <br />Travis, <br />Z j> _:/ /? t1?poAJ Y <br />A Q , <br />I am writin*esponse to your comments concerning the Piceance Creek Gravel Pit (Application No. M- <br />2001-077), dated February 3, 2009. <br />1) Exhibits C and F have been signed and sealed. Enclosed <br />2) All mining will be conducted from West to East. Shown on Exhibit C. <br />3) Approximately 12,000 cubic yards (of +/- 27,131 Cubic Yards) of topsoil will be stockpiled in this <br />location. <br />4) Pit will be mined in 3 phases: (Shown on Exhibit C) <br />Phase 1- 2009-2012, approximately 10 acres mined, 120,000 tons of material mined. <br />Phase II- 2013-2016, approximately 10 acres mined, 120,000 tons of material mined. <br />Phase III- 2017-permit expiration, approximately 10 acres mined, 120,000 tons of <br />material mined. <br />Please note that these figures are estimates. The tons of material mined may vary from year to <br />year as needs change. <br />5) See Pre-mine Plan Map showing existing vegetation <br />6) (Shown on Exhibit C) Water will be pumped to existing wetlands after settlement. Storage <br />ponds will be created, as mining operations progress, at shallow points. See de-watering <br />shallow points and flow direction on Mine Plan Map. Storage ponds will be created in <br />previously mined areas. Sediment berms will progress with mining operations (West to East). <br />7) 27,131 cubic yards of topsoil will be salvaged. Topsoil will be used to achieve the 3H:1V slope of <br />the berms surrounding the permit area. The remainder of the topsoil will be used to reclaim <br />overburden and topsoil stockpile areas on the West end of the permit area. It is estimated that <br />the depth of topsoil will be 8 inches in reclamation process.
The URL can be used to link to this page
Your browser does not support the video tag.